Access Denied!!!

It appears that you are using a private browser which blocks some scripts necessary for this page to function properly. As a result, you may experience limited functionality or the page may not work at all.

To access this page, please consider using a different browser or switch to the standard version of Firefox.

Thank you for your understanding.

Access Full Project

Publicly Funded

Privately Funded

Bidding Soon

Documents Available

Addenda Available

Post-Bid

Post-Bid

Saving Project...

Full details on over 250,000 Projects including 2000 updated daily available to subscribers

August 3, 2021

September 2, 2021

September 2, 2022

470 S Broad St

Renovation

No Information to Display

$4,085,021.00

Public - State/Provincial

img_map_placeholder

470 S Broad St, Abbeville, GA

Subscribe to View Full Documents

The deadline for submitting RFIs is July 26, 2021, at 2:00 p.m. This project includes the roof replacement of existing buildings, including the Front Entry Building, the Administration Building A, the Service Building B, seven 7) Dormitory Buildings D, E, F, G, H, J and L, and the Back Gate Building at Wilcox State Prison. The Administration Building, which is approximately 40,075 square feet, and the Front and Back Gate Buildings, which total approximately 1,680 square feet, are 27 years old. Six of the dormitory buildings are 25 years old, 5) building roofs are approximately 24,170 square feet each, 1) is approximately 26,078 square feet. These buildings are gravel surfaced built up roofs, partial metal deck and partial concrete deck. The existing roof systems are to be demolished to the deck and replaced with a single ply membrane roof system. The Service Building B, approximately 56,390 square feet and Dormitory Building L, approximately 15,497 square feet are existing metal roof systems that will receive an elastomeric coating. For additional information concerning the scope of this project please call: Nancy G. Jackson. No Communication with State Employees. From the date that this Invitation To Bid (ITB) is issued until a bidder is selected and the selection is announced, there shall be no communication for any reason, except during the pre-bid conference, between a bidder and any State employee other than thecontracting officer listed regarding this ITB. Questions regarding the bidding documents, the bidding process, e-Builder, and all other questions should be submitted in e-Builder. No questions other than those submitted in writing will be accepted, and only written responses will be binding upon GSFIC. GDC reserves the right to reject any or all statements of qualifications, and to waive technicalities and informalities at the discretion of GDC. Material Completion. The Material Completion Date is 365 Days

22 Record(s)

Subscribe to Get All Contact Details

Trades

Division 00 - Lorem Ipsum

Division 00 - Lorem Ipsum

Lorem, Ipsum, Dolor, Sit amet
Subscribe to See All Trade Details

You’ve Reached the Free View Limit

Want to see more project and bidder data in your market? Check out our product options and see what works best for you and your business.

Come back in [[refresh_days]] to get [[project_count]] more free projects.

Related Projects