Access Denied!!!

It appears that you are using a private browser which blocks some scripts necessary for this page to function properly. As a result, you may experience limited functionality or the page may not work at all.

To access this page, please consider using a different browser or switch to the standard version of Firefox.

Thank you for your understanding.

Access Full Project

Publicly Funded

Privately Funded

Bidding Soon

Documents Available

Addenda Available

Post-Bid

Post-Bid

Saving Project...

Full details on over 250,000 Projects including 2000 updated daily available to subscribers

July 29, 2020

February 8, 2021

No Information to Display

Johnson Fork Rd

Site Work

No Information to Display

No Information to Display

Public - County

img_map_placeholder

Johnson Fork Rd, West Harrison, IN

Subscribe to View Full Documents

As of August 6,2020 Received one bid which was over estimate. Bid was rejected. The Dearborn County Board of Commissioners will receive bids for a scour remediation on Dearborn County Bridge No. 87 on Johnson Fork Road over Johnson Fork Creek, excavation, concrete placement, riprap placement and all other necessary items in Dearborn County, Indiana, all in accordance with the Contract Documents and Specifications. The work shall include concrete placement and riprap placement under and around Pier No. 2 and Pier No. 3 of Dearborn County Bridge No. 87. Bids shall be properly and completely executed on the Proposal Form and Indiana State Board of Account Form 96 provided in the Contract Documents. Each bid shall be accompanied by a cashiers or certified check, drawn on an acceptable bank, or an acceptable bid bond, executed by the bidder and a Surety Company, in the amount equal to five (5%) percent of the total amount of the bid, payable to Dearborn County, Indiana. The bidder to whom a contract for work is awarded will be required to furnish a Performance, Maintenance and Payment Bond executed on the specified forms acceptable to the County, in the amount of one hundred percent (100%) of the Contract amount, which shall be in full force and effective for 12 months from date of acceptance of work. The Bidder must be a prequalified Contractor with the Indiana Department of Transportation in the following worktypes: D(a) Highway or Bridge over Water The Bidder must have a Certificate of existence from the Indiana Secretary of State. The Bidder must supply all the information required by the bid proposal form. Liquidated damages for delay will be as provided in the special provisions of the Contract Documents. Retainage will be as provided in the special provisions of the Contract Documents. Partial payment will be made monthly based on an approved payment requisition. The Contractor and all subcontractors will be required to comply with required Federal and State labor regulations including Equal Employment Opportunity, Non-segregated Facilities, and Affirmative Action requirements. The Board of Commissioners reserves the right to accept or reject any and all proposals or parts thereof and to waive all responsibility for irregularities in bids. Bids may be held by the County for a period not to exceed sixty (60) days from the date of the opening of the bids for the purpose of reviewing the bids and the investigation of the qualifications of bidders, prior to awarding of the Contract.

4 Record(s)

Subscribe to Get All Contact Details

Trades

Division 00 - Lorem Ipsum

Division 00 - Lorem Ipsum

Lorem, Ipsum, Dolor, Sit amet
Subscribe to See All Trade Details

You’ve Reached the Free View Limit

Want to see more project and bidder data in your market? Check out our product options and see what works best for you and your business.

Come back in [[refresh_days]] to get [[project_count]] more free projects.