Access Denied!!!

It appears that you are using a private browser which blocks some scripts necessary for this page to function properly. As a result, you may experience limited functionality or the page may not work at all.

To access this page, please consider using a different browser or switch to the standard version of Firefox.

Thank you for your understanding.

Access Full Project

Publicly Funded

Privately Funded

Bidding Soon

Documents Available

Addenda Available

Post-Bid

Post-Bid

Saving Project...

Full details on over 250,000 Projects including 2000 updated daily available to subscribers

October 31, 2023

April 8, 2024

October 22, 2025

AB-88

Site Work

No Information to Display

$5,000,000.00

Public - State/Provincial

img_map_placeholder

AB-88, Fort Vermilion, AB

Subscribe to View Full Documents

Bridge Deck Concrete Overlay, Bridge Deck Joint Replacement and Other Work BF74227-Consol-P-2023-03-31 BF74227 88:18 BF 74227 - Carrying Hwy. 88 over Peace River, 8 km NW of Ft Vermilion kilometre 29.527 to 29.527 PEACE REGION APPROXIMATE QUANTITIES: 4495 Square Metres Surface Removal - Deck and Roof Slab 1 Lump Sum Demolition and Disposal of Bridge Structure 950 Metres Concrete Crack Repair - Curbs 2000 Anodes Galvanic Corrosion Protection - Supply and Install 113 Tonne Asphalt Concrete Pavement Mix Type H2 6000 Square Metres Erosion Control Soil Covering - Supply and Install (Type C) Contractor to supply all materials.

69 Record(s)

Subscribe to Get All Contact Details

Trades

Division 00 - Lorem Ipsum

Division 00 - Lorem Ipsum

Lorem, Ipsum, Dolor, Sit amet
Subscribe to See All Trade Details

You’ve Reached the Free View Limit

Want to see more project and bidder data in your market? Check out our product options and see what works best for you and your business.

Come back in [[refresh_days]] to get [[project_count]] more free projects.

Related Projects