Access Denied!!!

It appears that you are using a private browser which blocks some scripts necessary for this page to function properly. As a result, you may experience limited functionality or the page may not work at all.

To access this page, please consider using a different browser or switch to the standard version of Firefox.

Thank you for your understanding.

Access Full Project

Publicly Funded

Privately Funded

Bidding Soon

Documents Available

Addenda Available

Post-Bid

Post-Bid

Saving Project...

Full details on over 250,000 Projects including 2000 updated daily available to subscribers

July 22, 2020

August 21, 2020

October 15, 2020

Multiple Locations

Paving, Site Work

No Information to Display

$74,080.00

Public - City

img_map_placeholder

Multiple Locations, Bangor, PA

Subscribe to View Full Documents

All bidders shall be PennDOT pre-qualified and all materials shall be PennDOT approved. Each bidder is required to bid on the total project. All quantities listed are approximate. Liquidated damages apply at the rate of $825.00 per calendar day. MBE Goal: 5.0% WBE Goal: 3.0%, Contracting Goal:10%. DCED will review the certified payrolls and invoices. Pending any problems (non-compliance with wage rates, unapproved expenses, etc.), the County will provide payment to the municipality in no more than 30 days. This project is funded partially by a Community Development Block Grant (CDBG) provided through Northampton County. As such, the contractor must become familiar with and comply with the terms and conditions specified in the project grant. All Contractors and Subcontractors are required to pay Davis-Bacon wage rates, comply with the equal opportunity and other regulations within the bid documents as well as submit all forms and certifications requested by and cooperate fully with all representatives of the funding agency, the Engineer and the Owner. Bidders must submit documentary evidence of Minority and Women Business Enterprises I Section 3 Enterprises (MBE/WBE/Section 3) that have been contacted and to whom commitments have been made. Documentation of such solicitations and commitments shall be submitted concurrently with the bid. The first advertisement must be published not more than forty-five (45) days and the second advertisement not less than ten (10) days prior to the date fixed for the opening of bids. Each bid must be accompanied by a bid bond or certified check made payable to "Bangor Borough" in the amount of 10% of the total bid in accordance with the Instructions to Bidders. The successful bidder shall provide a performance bond or certified check to the municipality in the amount of 100% of the contract within 20 days after the contract is awarded. The municipality reserves the right to reject any or all bids, and to waive any defects, errors, omissions, mistakes, irregularities, informalities, or technicalities in any bid. All bids shall be irrevocable for sixty (60) days after the bid opening date. QA Deadline 15 July, 2:30 PM 2020

36 Record(s)

Subscribe to Get All Contact Details

Trades

Division 00 - Lorem Ipsum

Division 00 - Lorem Ipsum

Lorem, Ipsum, Dolor, Sit amet
Subscribe to See All Trade Details

You’ve Reached the Free View Limit

Want to see more project and bidder data in your market? Check out our product options and see what works best for you and your business.

Come back in [[refresh_days]] to get [[project_count]] more free projects.