Access Denied!!!

It appears that you are using a private browser which blocks some scripts necessary for this page to function properly. As a result, you may experience limited functionality or the page may not work at all.

To access this page, please consider using a different browser or switch to the standard version of Firefox.

Thank you for your understanding.

Access Full Project

Publicly Funded

Privately Funded

Bidding Soon

Documents Available

Addenda Available

Post-Bid

Post-Bid

Saving Project...

Full details on over 250,000 Projects including 2000 updated daily available to subscribers

August 2, 2023

September 1, 2023

November 20, 2023

1038 Ross Ave

Demolition, New Construction, Paving, Site Work

No Information to Display

No Information to Display

Public - City

img_map_placeholder

1038 Ross Ave, Saint Paul, MN

Subscribe to View Full Documents

2.1 Contractors must assume the responsibility to examine all sections of the drawings to determine the full extent of the work. Contractors shall verify dimensions in the field, as required and examine existing job conditions and adjoining construction which may affect the acceptability of this work. 2.2 Protect building from unauthorized intrusions at all times. Provide secure temporary enclosures for all building openings at the end of each workday. 2.3 The Contractor shall comply with manufacturers' recommendation on environmental conditions at the time of application of the work. 2.4 Install all materials supplied for this project in accordance with the drawings and the manufacturer's instructions. 2.5 The Contractor shall deliver, to the Owner, all items which have been designated to be salvaged and are to be retained by the Owner. All other items not designated by the Owner shall become the property of the Contractor, who shall dispose of it in an approved manner. AET Project No. P-0013055 City of Saint Paul Fire Department is looking for bids on Fire Station 7 Site Improvement. Construction of a new fire station to include site improvements and construction of a new facility. Install all materials supplied for this project in accordance with the drawings and the manufacturer's instructions. The Contractor shall deliver, to the Owner, all items which have been designated to be salvaged and are to be retained by the Owner. All other items not designated by the Owner shall become the property of the Contractor, who shall dispose of it in an approved manner. Q And A Open: 06/26/2023 08:00:00 PM Q And A Close: 07/12/2023 02:00:00 PM This project is covered by Minnesota prevailing wage statutes. Wage rates listed below are the minimum hourly rates to be paid on this project. The City reserves the right to accept/reject any or all bids or portions thereof, and further, reserves the right to accept/reject any or all subcontractors. Under direct supervision of a Professional Structural Engineer experienced in design of this Work and licensed in the State in which the Project is located.

80 Record(s)

Subscribe to Get All Contact Details

Trades

Division 00 - Lorem Ipsum

Division 00 - Lorem Ipsum

Lorem, Ipsum, Dolor, Sit amet
Subscribe to See All Trade Details

You’ve Reached the Free View Limit

Want to see more project and bidder data in your market? Check out our product options and see what works best for you and your business.

Come back in [[refresh_days]] to get [[project_count]] more free projects.