Access Denied!!!

It appears that you are using a private browser which blocks some scripts necessary for this page to function properly. As a result, you may experience limited functionality or the page may not work at all.

To access this page, please consider using a different browser or switch to the standard version of Firefox.

Thank you for your understanding.

Access Full Project

Publicly Funded

Privately Funded

Bidding Soon

Documents Available

Addenda Available

Post-Bid

Post-Bid

Saving Project...

Full details on over 250,000 Projects including 2000 updated daily available to subscribers

May 11, 2021

July 1, 2021

February 1, 2022

E 600 S & S 700 E

Site Work

No Information to Display

$2,250,000.00

Public - State/Provincial

img_map_placeholder

E 600 S & S 700 E, Salt Lake City, UT

Subscribe to View Full Documents

Construct a TRAX platform between the existing rails on Main Street between 600 South and 700 South. Including all pertinent equipment and mid-block cross walk. No track work or OCS work will be required. However, all workers will be required to obtain an RWP to work in the UTA Right-of-way (in 2021 may be obtained on-line) Approximate Budget Estimate $1,750,000 - $2,250,000 Project Start Date/Length July 2021/TBD Contract Type Firm Fixed Price Construction Funding Source Local DBE Goal None Bid Bond (5%) Performance Bond (Contractor will need to obtain a letter showing bond capacity & contractor can be bonded at bid submittal. Bond will be required at final contracting) Payment Bond (Bond will be required at final contracting) *The value for this project is based on a financial range. The value is listed as the highest possible cost from the range provided by a stakeholder or official project document. General Contractor will construct a light-rail TRAX platform in the area previously planned for a platform on Main Street between 600 and 700 South. The platform will include a concrete platform with high-blocks and canopies. Lighting of the area and a snowmelt system are included as are electrical and mechanical connections. A Mid-block crosswalk and ADA ramps will also be constructed at approximately 660 South. Assisting with the installation of an 'Art in Transit' art installation is also included. NO track or OCS work is required. However, all workers will be required to obtain an RWP to work in the UTA right-of-way (in 2021 may be obtained on-line). All work around tracks will require a no fee permit from UTA, including for work done by excavators. This permit application will allow UTA to determine if work planned around OCS poles will require a shutdown of the system Question Submission Close Date 5/3/2021 12:00 AM MDT

11 Record(s)

Subscribe to Get All Contact Details

Trades

Division 00 - Lorem Ipsum

Division 00 - Lorem Ipsum

Lorem, Ipsum, Dolor, Sit amet
Subscribe to See All Trade Details

You’ve Reached the Free View Limit

Want to see more project and bidder data in your market? Check out our product options and see what works best for you and your business.

Come back in [[refresh_days]] to get [[project_count]] more free projects.

Related Projects