Access Denied!!!

It appears that you are using a private browser which blocks some scripts necessary for this page to function properly. As a result, you may experience limited functionality or the page may not work at all.

To access this page, please consider using a different browser or switch to the standard version of Firefox.

Thank you for your understanding.

Access Full Project

Publicly Funded

Privately Funded

Bidding Soon

Documents Available

Addenda Available

Post-Bid

Post-Bid

Saving Project...

Full details on over 250,000 Projects including 2000 updated daily available to subscribers

June 7, 2022

August 5, 2022

September 10, 2024

69 W Main St

Renovation

No Information to Display

$41,393,910.00

Public - City

img_map_placeholder

69 W Main St, Spencer, MA

Subscribe to View Full Documents

Contractor Qualification DCAMM Certificate The work consists of various improvements to the Wastewater Treatment Plant to address upcoming phosphorus and copper limits, achieve nitrogen removal goals, and replace aging infrastructure. Major work of the project includes construction of a new Tertiary Treatment building to house phosphorus removal equipment, UV disinfection equipment, chemical storage tanks, return activated sludge pumps and plant water pumps; construction of a new secondary clarifier; construction of a new secondary clarifier distribution box; construction of a new aeration tank; construction of a new aeration tank distribution box; replacement of the influent screen; a new grit removal system; new submersible influent pumps; installation of equipment for nitrogen removal; renovations to an existing building to create lab space; renovations to existing tanks and construction of new infrastructure for improved septage receiving and storage; renovations to an existing sludge storage tank; installation of new sludge thickening equipment; construction of a new thickened sludge storage silo for alkalinity addition; site work and underground utility work to support the various improvements at the plant; and the various sub-trade work required to support the project including major electrical, HVAC and Plumbing improvements

127 Record(s)

Subscribe to Get All Contact Details

Trades

Division 00 - Lorem Ipsum

Division 00 - Lorem Ipsum

Lorem, Ipsum, Dolor, Sit amet
Subscribe to See All Trade Details

You’ve Reached the Free View Limit

Want to see more project and bidder data in your market? Check out our product options and see what works best for you and your business.

Come back in [[refresh_days]] to get [[project_count]] more free projects.

Related Projects