Access Denied!!!

It appears that you are using a private browser which blocks some scripts necessary for this page to function properly. As a result, you may experience limited functionality or the page may not work at all.

To access this page, please consider using a different browser or switch to the standard version of Firefox.

Thank you for your understanding.

Access Full Project

Publicly Funded

Privately Funded

Bidding Soon

Documents Available

Addenda Available

Post-Bid

Post-Bid

Saving Project...

Full details on over 250,000 Projects including 2000 updated daily available to subscribers

April 9, 2020

May 11, 2020

June 25, 2021

Multiple Locations

Paving, Site Work

No Information to Display

$1,618,034.00

Public - City

img_map_placeholder

Multiple Locations, Crystal, MN

44

8

2

6

Subscribe to View Full Documents

For Utility Reconstruction For the Furnishing of All Labor, Material, and Equipment for the Construction of the Following Estimated Major Quantities of Work:item Quantitycommon Excavation (P) 2,165 Cyaggregate Base, Class 5 4,158 Tontype Spwea340c Wearing Course Mixture 978 Ton4-inch Pe Corrugated Perforated Pipe Drain With Sock 5,578 Lf15-inch Storm Sewer Pipe 335 Lflining Sewer Service Pipe 4-inch 18 Each8" Pvc Pipe Sewer (Sanitary Sdr 35) 2,446 Lf6" Watermain Ductile Iron Cl 52 2,670 Lfconstruct Sanitary Sewer Manhole 10 Eachconcrete Curb and Gutter, Design B618 5,441 Lfsodding, Type Lawn 1,911 Sy Bid security in the amount of 5% of the bid must accompany each bid in accordance with the Instructions to Bidders.A Contractor responding to these Bidding Documents must submit to the City a signed statement under oath by an owner or officer verify-ing compliance with each of the minimum criteria in Minnesota Statutes, section 16C.285, subdivision 3.Bidders are required to submit information indicating they have prac-tical experience of the particular construction work bid upon, and that they have the ability and resources to complete the proposed work in a manner satisfactory to the Owner. A contract award will only be made to a bidder meeting the minimum contractor qualifications as stated within the contract specifications.Bids shall be directed to the City Engineer, securely sealed and en-dorsed upon the outside wrapper, BID FOR 2020 - UTILITY RECON-STRUCTION, CRYSTAL, MINNESOTA, CITY PROJECT NO. 2020-01. The City of Crystal reserves the right to reject any and all bids, to waive irregularities and informalities therein and to award the Contract in the best interests of the City.

48 Record(s)

Subscribe to Get All Contact Details

Trades

Division 00 - Lorem Ipsum

Division 00 - Lorem Ipsum

Lorem, Ipsum, Dolor, Sit amet
Subscribe to See All Trade Details

You’ve Reached the Free View Limit

Want to see more project and bidder data in your market? Check out our product options and see what works best for you and your business.

Come back in [[refresh_days]] to get [[project_count]] more free projects.

Related Projects