Access Denied!!!

It appears that you are using a private browser which blocks some scripts necessary for this page to function properly. As a result, you may experience limited functionality or the page may not work at all.

To access this page, please consider using a different browser or switch to the standard version of Firefox.

Thank you for your understanding.

Access Full Project

Publicly Funded

Privately Funded

Bidding Soon

Documents Available

Addenda Available

Post-Bid

Post-Bid

Saving Project...

Full details on over 250,000 Projects including 2000 updated daily available to subscribers

No Information to Display

May 31, 2024

No Information to Display

SW Beef Bend Rd

Site Work

No Information to Display

$2,000,000.00

Public - City

img_map_placeholder

SW Beef Bend Rd, King City, OR

Documents for this project are exclusively Specifications. If Plans become available, we will add them here.

Subscribe to View Full Documents

As of October 25, 2023, per owner, the master plan was adopted a couple months ago. The final component of the code work should be adopted later this month. A firm has been contracted to complete the master plan. Grading work could begin in Spring 2024 with construction to follow. Proposals from qualified and experienced firms to provide master planning services to the City for the King City Beef Bend South Master Plan (the "Project"). The City's objective is to enter into an agreement that will provide these comprehensive services. The City's expectation of any proposer the City contracts with is that the proposer's values align with the City's values of highly ethical conduct, fiscal responsibility, respect for the City and others, and responsiveness to the City's residents, customers, and stakeholders. The city completed the Concept Plan - King City Urban Reserve Area 6D, which ultimately led to Metro approval to bring this area, which is now referred to as Beef Bend South, into the UGB at the end of 2018. The Master Plan is intended to refine the concept plan to provide additional development detail and outcomes consistent with the 2040 Growth Concept, Urban Growth Management Functional Plan, and the Metro conditions of approval for the UGB decision (see Appendix B). This project will be coordinated with the city's first Transportation System Plan (TSP), which has been funded by the state's TGM program, to create a transportation plan that will be fully integrated with existing and future land use. The TSP is anticipated to be completed prior to the Master Plan. However, the project scope anticipates delaying TSP adoption until the Master Plan is completed to allow for any final adjustments to ensure consistency between the two plans. A copy of the TSP scope and schedule is available (see Appendix C). The Master Plan will guide the necessary amendments to the King City Comprehensive Plan and Community Development Code (CDC). The project will be funded largely by a Metro 2040 Planning and Development Grant. The Request for Proposals (RFP) documents, and any addenda thereto, may be obtained a. Successful proposers will be asked to sign an agreement with the City. A sample of the Agreement is attached as part of the RFP documents. The City will require, among other things, specific levels of insurance, a King City business registration, and a tax identification number. Proposers must evaluate this Agreement and agree with the terms and conditions contained therein unless written objections are included as addenda with their proposal. The City will review the addenda and content of any such objection in the proposal evaluation process. Objections after the awarding of the contract will not be considered and are grounds for subsequent denial of the contract. Inquiries shall be directed to Michael Weston, the Project Manager, by phone (503.639.4082) or email (mweston@ci.king-city.or.us). The City reserves the right to reject any and all proposals or to negotiate individually with one or more proposers, and to select one or more proposers if determined to be in the best interest of the City.

3 Record(s)

Subscribe to Get All Contact Details

Trades

Division 00 - Lorem Ipsum

Division 00 - Lorem Ipsum

Lorem, Ipsum, Dolor, Sit amet
Subscribe to See All Trade Details

You’ve Reached the Free View Limit

Want to see more project and bidder data in your market? Check out our product options and see what works best for you and your business.

Come back in [[refresh_days]] to get [[project_count]] more free projects.