Access Denied!!!

It appears that you are using a private browser which blocks some scripts necessary for this page to function properly. As a result, you may experience limited functionality or the page may not work at all.

To access this page, please consider using a different browser or switch to the standard version of Firefox.

Thank you for your understanding.

Access Full Project

Publicly Funded

Privately Funded

Bidding Soon

Documents Available

Addenda Available

Post-Bid

Post-Bid

Saving Project...

Full details on over 250,000 Projects including 2000 updated daily available to subscribers

April 23, 2020

July 27, 2020

October 15, 2021

150 35th St

New Construction, Paving, Site Work

No Information to Display

No Information to Display

Public - City

img_map_placeholder

150 35th St, Newport News, VA

Subscribe to View Full Documents

This project was originally scheduled to bid on 04/14/2020. Bid postponed to 04/21/2020 Project involves final grading for the station building site (approximately 18 acres), constructing the station building (including the building, platform canopy and landscaping), constructing the platform, site finishes and providing erosion and sediment controls to stabilize the site. DBE goal is 8% Construction of grading, drainage, soil erosion and sediment controls, station building and platform, retaining walls, paving, signage, markings, landscaping, lighting, and utility connections in accordance with Plans, Contract, and Special Provisions. Questions or comments related to this solicitation shall be directed to the Contract Officer, Shari Colvin, scolvin@nnva.gov and copy the Assistant Buyer, Vernest Rice, ricevo@nnva.gov not later than 1:00 p.m. on March 31, 2020. All questions shall be submitted in writing (email is preferred). Telephone inquiries will not be accepted. Each bid shall be accompanied by a Bidder's bond issued by a company authorized and licensed to transact business as surety in the Commonwealth of Virginia, a certified check, or cash escrow, in an amount equal to not less than five (5) percent of the total amount of the bid, made payable to the City of Newport News Virginia. Performance Bond: 100% Payment Bond: 100% Work to be Completed in: 510 Days Liquidated Damages: $2500.00 per calendar day after time for Substantial Completion has expired. $1,250.00 per calendar day after time for Final Completion has expired. The City reserves the right to reject any and all bids, including if the City determines that any of the bid prices are significantly unbalanced to the potential detriment of the City, and to waive any informality, if it is determined to be in the best interest of the City. *This project timeline has been extended due to the public health crisis. Project No : 109076, 20-2588-2031 MBE : 29.7% WBE : 6.9% DBE : 8%

19 Record(s)

Subscribe to Get All Contact Details

Trades

Division 00 - Lorem Ipsum

Division 00 - Lorem Ipsum

Lorem, Ipsum, Dolor, Sit amet
Subscribe to See All Trade Details

You’ve Reached the Free View Limit

Want to see more project and bidder data in your market? Check out our product options and see what works best for you and your business.

Come back in [[refresh_days]] to get [[project_count]] more free projects.

Related Projects