Access Denied!!!

It appears that you are using a private browser which blocks some scripts necessary for this page to function properly. As a result, you may experience limited functionality or the page may not work at all.

To access this page, please consider using a different browser or switch to the standard version of Firefox.

Thank you for your understanding.

Access Full Project

Publicly Funded

Privately Funded

Bidding Soon

Documents Available

Addenda Available

Post-Bid

Post-Bid

Saving Project...

Full details on over 250,000 Projects including 2000 updated daily available to subscribers

No Information to Display

November 1, 2023

July 1, 2025

1 Hairpin Dr

LEED Certification, New Construction, Paving, Renovation, Site Work

No Information to Display

$109,000,000.00

Public - State/Provincial

img_map_placeholder

1 Hairpin Dr, Edwardsville, IL

We’ve obtained documents for this project and are currently processing them.

Subscribe to View Full Documents

As of October 12th, 2023, architect and a Design Build team have been selected. Construction is expected to start in fall 2023, with completion in summer 2025. The previous solicitation is listed below for reference. --- The scope of work includes preparing program statement/scope development package followed by the bridging documents for the Design-Build project. Minimum of LEED Silver Certification will be required and additional energy efficiencies will be considered. Elements of the project will include construction of a health sciences building, connections to two existing buildings and renovation to the existing buildings. Design considerations: - Schools of pharmacy, nursing and related health sciences programs will be accommodated in the building. - Classroom's accommodations. - Teaching/research laboratories. - Nursing simulation laboratory. - Faculty offices/administrative spaces. - Student resources and study spaces. - Parking lot and site circulation design/improvements. Program analysis and schematic design will include the following major elements: - Identify and document requirements for compliance with applicable codes, regulations, standards and agencies having oversight of design and construction. - Schematic design for programmed functions. The bridging documents will include, but are not limited to: - Project intent. - Preliminary site plan. - Program elements. - Conceptual designs. - Required infrastructure expansion or modification. - Preliminary specifications to establish basis of design. The A/E will develop a comprehensive bridging document, including all of the mentioned elements, in addition to all other miscellaneous criteria as required to provide clearly defined design guidance as a precursor for the follow-on Design-Build contract. The bridging documents will be developed in accordance with the CDB's Guidelines for Bridging Documents (available for download on the CDB Reference Library) as appropriate to the project's specific scope of work. The A/E will need to identify if any components of this project are eligible for a utility company or other energy grant/rebate and will be responsible for assisting with the grant application if the project qualifies for the rebate. A combined MBE/WBE goal of 20 percent is applicable to the A/E team. Some level of participation from both MBE and WBE firms is required to satisfy this goal. A VBE goal of 3 percent is applicable to the A/E team. The interviews for this project are tentatively scheduled for May 1, 2020.

8 Record(s)

Subscribe to Get All Contact Details

Trades

Division 00 - Lorem Ipsum

Division 00 - Lorem Ipsum

Lorem, Ipsum, Dolor, Sit amet
Subscribe to See All Trade Details

You’ve Reached the Free View Limit

Want to see more project and bidder data in your market? Check out our product options and see what works best for you and your business.

Come back in [[refresh_days]] to get [[project_count]] more free projects.

Related Projects