Access Denied!!!

It appears that you are using a private browser which blocks some scripts necessary for this page to function properly. As a result, you may experience limited functionality or the page may not work at all.

To access this page, please consider using a different browser or switch to the standard version of Firefox.

Thank you for your understanding.

Access Full Project

Publicly Funded

Privately Funded

Bidding Soon

Documents Available

Addenda Available

Post-Bid

Post-Bid

Saving Project...

Full details on over 250,000 Projects including 2000 updated daily available to subscribers

December 14, 2023

March 1, 2024

June 13, 2028

To Be Determined

New Construction, Site Work

No Information to Display

$347,500,000.00

Public - County

img_map_placeholder

To Be Determined, Cleveland, OH

Subscribe to View Full Documents

The Southerly Tunnel (SOT) and Consolidation (SOTC) project is a primary component of Control Measure #21 of the District's Consent Decree and includes the construction of a 23-foot diameter storage tunnel constructed in soil and extending approximately 18,000 feet in length, as well as two consolidation sewer systems that will connect to SOT, the Burke Brook and Morgana Run consolidation sewers. The SOT system will be dewatered by the Southerly Tunnel Dewatering Pump Station (STDPS), designed under a separate project, to send stored wet weather flows to the SWWTP. As of February 26, 2022, this project is currently in the FY 2022-2026 CIP. Funding for this project is allotted in the city's capital improvement plan for construction FY 2024. A firm timeline has not been established; however, construction is scheduled for Fiscal Year 2024. *Project information has been obtained through a public capital improvement plan (CIP). A CIP is a financial schedule for short- and long-range projects which is updated regularly. Information listed in the CIP often evolves based on funding availability and the project details, including timeline and value, are subject to change. The content management team will continue to pursue additional details as they become available.

104 Record(s)

Subscribe to Get All Contact Details

Trades

Division 00 - Lorem Ipsum

Division 00 - Lorem Ipsum

Lorem, Ipsum, Dolor, Sit amet
Subscribe to See All Trade Details

You’ve Reached the Free View Limit

Want to see more project and bidder data in your market? Check out our product options and see what works best for you and your business.

Come back in [[refresh_days]] to get [[project_count]] more free projects.

Related Projects