Access Denied!!!

It appears that you are using a private browser which blocks some scripts necessary for this page to function properly. As a result, you may experience limited functionality or the page may not work at all.

To access this page, please consider using a different browser or switch to the standard version of Firefox.

Thank you for your understanding.

Access Full Project

Publicly Funded

Privately Funded

Bidding Soon

Documents Available

Addenda Available

Post-Bid

Post-Bid

Saving Project...

Full details on over 250,000 Projects including 2000 updated daily available to subscribers

March 9, 2020

May 8, 2020

August 15, 2020

Multiple Locations

Paving, Site Work

No Information to Display

$804,509.00

Public - City

img_map_placeholder

Multiple Locations, Richland Center, WI

28

18

2

3

Subscribe to View Full Documents

The work for which bids are asked includes the following: approximately 1500 lineal feet of street reconstruction including excavation and removals, water main, sanitary sewer, service laterals, storm sewer, aggregate base, concrete curb and gutter, driveway aprons and sidewalk replacement and asphalt pavement. Work also includes approximately 300 lineal feet of sanitary sewer construction by directional drilling. Work includes traffic control, asphalt and concrete removal, utility appurtenances, service laterals and patch restoration. Contractor pre-qualification is required. No proposal will be accepted unless accompanied by a certified check or bid bond equal to at least 5% of the amount bid, payable to the Owner as a guarantee that, if the bid is accepted, the bidder will execute and file the proper contract and bond within 15 days after the award of the contract. Bidder is required to deliver the original certified check or bid bond within the 72 hours of bid opening to MSA Professional Services, Inc., Attn: Andrew Zimmer, P.E., 1230 South Boulevard, Baraboo, WI 53913. The certified check or bid bond will be returned to the bidder as soon as the contract is signed, and if after 15 days the bidder shall fail to do so, the certified check or bid bond shall be forfeited to the Owner as liquidated damages. No bidder may withdraw his bid within 60 days after the actual date of the opening thereof. Owner reserves the right to waive any informalities or to reject any or all bids.

23 Record(s)

Subscribe to Get All Contact Details

Trades

Division 00 - Lorem Ipsum

Division 00 - Lorem Ipsum

Lorem, Ipsum, Dolor, Sit amet
Subscribe to See All Trade Details

You’ve Reached the Free View Limit

Want to see more project and bidder data in your market? Check out our product options and see what works best for you and your business.

Come back in [[refresh_days]] to get [[project_count]] more free projects.

Related Projects