Access Denied!!!

It appears that you are using a private browser which blocks some scripts necessary for this page to function properly. As a result, you may experience limited functionality or the page may not work at all.

To access this page, please consider using a different browser or switch to the standard version of Firefox.

Thank you for your understanding.

Access Full Project

Publicly Funded

Privately Funded

Bidding Soon

Documents Available

Addenda Available

Post-Bid

Post-Bid

Saving Project...

Full details on over 250,000 Projects including 2000 updated daily available to subscribers

March 11, 2020

April 15, 2020

August 14, 2021

S 168th St

Demolition, New Construction, Paving, Site Work

No Information to Display

$3,062,344.00

Public - County

img_map_placeholder

S 168th St, Gretna, NE

Subscribe to View Full Documents

Question Cutoff Date 3/5/2020 01:00:00 PM (ET) This project will be constructed in two phases. Phase 1 will consist of grading and paving from Sta. 26+00 to Sta. 44+48. Phase 2 will consist of grading, paving and bridge from Sta. 3+85 to Sta. 26+00 This project will be constructed in two phases. Phase 1 will consist of grading and paving from Sta. 26+00 to Sta. 44+48. Phase 2 will consist of grading, paving and bridge from Sta. 3+85 to Sta. 26+00. Phase 1: The anticipated completion of right-of-way acquisition is April 8, 2020. Sarpy County and the Contractor shall agree on an expected start date between April 15, 2020, and June 1, 2020 An early start may be approved prior to April 15, 2020, if mutually agreeable subject to limitations stated in the Contract Documents. The contract period of performance for Phase 1 is ninety (90) calendar days from the established start date. Contractor shall be responsible for complete all grading, paving and seeding. All equipment and barricades shall be removed from the roadway to a location agreeable to the Engineer prior to September 16, 2020, the opening day of Vala's Pumpkin Patch. 168th Street is to be open to unrestricted two-lanes of traffic from September 16, 2020 to November 2, 2020. Contractor shall be responsible for maintaining the construction site between Phase 1 and Phase 2 construction. Phase 2: Phase 2 shall commence on November 2, 2020. All work shall be completed on or before August 14, 2021, two hundred eight five (285) calendar days, without exception. Contractor shall be responsible to complete all grading, bridge, paving and seeding.

84 Record(s)

Subscribe to Get All Contact Details

Trades

Division 00 - Lorem Ipsum

Division 00 - Lorem Ipsum

Lorem, Ipsum, Dolor, Sit amet
Subscribe to See All Trade Details

You’ve Reached the Free View Limit

Want to see more project and bidder data in your market? Check out our product options and see what works best for you and your business.

Come back in [[refresh_days]] to get [[project_count]] more free projects.