Access Denied!!!

It appears that you are using a private browser which blocks some scripts necessary for this page to function properly. As a result, you may experience limited functionality or the page may not work at all.

To access this page, please consider using a different browser or switch to the standard version of Firefox.

Thank you for your understanding.

Access Full Project

Publicly Funded

Privately Funded

Bidding Soon

Documents Available

Addenda Available

Post-Bid

Post-Bid

Saving Project...

Full details on over 250,000 Projects including 2000 updated daily available to subscribers

No Information to Display

March 12, 2021

No Information to Display

Multiple Locations

New Construction, Site Work

No Information to Display

$300,000.00

Public - County

img_map_placeholder

Multiple Locations, Conneaut, OH

Plans and Specifications are not available for this project. If that changes, they will be made available here.

Subscribe to View Full Documents

The Conneaut Township Park Commissioners, Ashtabula County, Ohio intend to contract for Architectural/Engineering Services. Statement of Qualifications shall include the following sections: 1. History of firm; 2. Education and experience of Owners and key technical personnel; 3. General technical expertise of the firms current staff; 4. Firms experience in design and construction of park facilities and site improvements; 5. Availability of staff; 6. Firms equipment and facilities; 7. References; and 8. Recent project history at Conneaut Township Park. Design and construction of bathhouse/ concessions/pavilion building, ballfields and site amenities, Lake Erie access stair/observation deck and parking lot expansion. The park commissioners reserve the right to conduct interviews with the most qualified responding firm(s). The Park Commissioners may arrange to meet with key members of the firms proposed project team. It will be the commissioners sole decision on which firm(s) are interviewed and the associated date/time. The Park Commissioners retain the option of rejecting or accepting any Statements of Qualifications. Should a firm be selected and the Park Commissioners cannot negotiate a contract with the selected firm, the Park Commissioners shall inform the firm it deems next best qualified. If negotiations again fail, the same procedure shall be followed with each next best qualified firm selected until a contract is negotiated. However, the Park Commissioners retain the right to reject all SOQs and initiate the process of obtaining Statement of Qualifications from qualified firms at a later date. By Order of the Conneaut Township Park Commissioners:

1 Record(s)

Subscribe to Get All Contact Details

Trades

Division 00 - Lorem Ipsum

Division 00 - Lorem Ipsum

Lorem, Ipsum, Dolor, Sit amet
Subscribe to See All Trade Details

You’ve Reached the Free View Limit

Want to see more project and bidder data in your market? Check out our product options and see what works best for you and your business.

Come back in [[refresh_days]] to get [[project_count]] more free projects.