Access Denied!!!

It appears that you are using a private browser which blocks some scripts necessary for this page to function properly. As a result, you may experience limited functionality or the page may not work at all.

To access this page, please consider using a different browser or switch to the standard version of Firefox.

Thank you for your understanding.

Access Full Project

Publicly Funded

Privately Funded

Bidding Soon

Documents Available

Addenda Available

Post-Bid

Post-Bid

Saving Project...

Full details on over 250,000 Projects including 2000 updated daily available to subscribers

November 22, 2023

February 1, 2024

No Information to Display

2000 N Minnesota Ave

New Construction, Paving, Site Work

No Information to Display

$15,050,000.00

Public - City

img_map_placeholder

2000 N Minnesota Ave, Sioux Falls, SD

We’ve obtained documents for this project and are currently processing them.

Subscribe to View Full Documents

The purpose of this RFP is to solicit proposals for a Construction Manager at Risk (CMAR) for the City of Sioux Falls Light, Power, and Traffic Operations Facility along with a potential fueling site, maintenance building, and vehicle wash. The new City Light, Power, and Traffic Operations Facility will be split into four main programming areas. These areas include office, workshop, garage, and storage. The intent is to include the following components: 1. An open, flexible, and functional environment. 2. Incorporation of design standards that promote collaboration, employee well-being, ergonomics, and allow for future expansion. 3. Furniture, fixtures, and equipment as approved by the City. 4. Incorporation of City of Sioux Falls High Performance Building Standards, as agreed upon by the project team. Project Delivery System The City intends to enter into an open book Cost of the Work plus a Fee with Guaranteed Maximum Price (GMP) contractual arrangement with the selected CMAR for the construction work required but will retain the option to select a different CMAR after the completion of the preconstruction services or utilize a different selection and/or bidding process if deemed to be in the City’s best interest. Project budget is $15,050,000, this budget amount includes A/E work, furniture, fixtures, equipment (FFE) and other soft costs. *The value for this project is based on a financial range. The value is listed as the highest possible cost from the range provided by a stakeholder or official project document. The City reserves the right to reject any and all proposals, to waive formalities, and to select the proposal and the Firm that, in the City’s sole discretion, is in the best interests of the City

2 Record(s)

Subscribe to Get All Contact Details

Trades

Division 00 - Lorem Ipsum

Division 00 - Lorem Ipsum

Lorem, Ipsum, Dolor, Sit amet
Subscribe to See All Trade Details

You’ve Reached the Free View Limit

Want to see more project and bidder data in your market? Check out our product options and see what works best for you and your business.

Come back in [[refresh_days]] to get [[project_count]] more free projects.

Related Projects