Access Denied!!!

It appears that you are using a private browser which blocks some scripts necessary for this page to function properly. As a result, you may experience limited functionality or the page may not work at all.

To access this page, please consider using a different browser or switch to the standard version of Firefox.

Thank you for your understanding.

Access Full Project

Publicly Funded

Privately Funded

Bidding Soon

Documents Available

Addenda Available

Post-Bid

Post-Bid

Saving Project...

Full details on over 250,000 Projects including 2000 updated daily available to subscribers

January 30, 2020

April 30, 2020

October 30, 2020

Multiple Locations

Paving, Site Work

No Information to Display

No Information to Display

Public - State/Provincial

img_map_placeholder

Multiple Locations, Rockford, IL

Subscribe to View Full Documents

**As of March 5, 2020, project has not been awarded yet. Cost estimate: $0-$10M Westbound Pavement and Structural Preservation and Rehabilitation and Toll Plaza 2 Improvements. The location of services to be performed on the Jane Addams Memorial Tollway (I-90) between Mile Post 2.6 (Rockton Road) and Mile Post 18.3 (Kishwaukee River Bridge) and at Toll Plaza 2 (East Riverside Boulevard) Mile Post 12.5 in Winnebago County, Illinois. The scope of the work shall consist of the following: Mainline pavement and shoulder patching; ramp pavement repairs and patching; overhead sign structure, retaining wall and noise abatement wall repairs; drainage improvements; signing improvements; pavement marking installation; toll plaza conversion; landscaping and erosion control; and maintenance of traffic. Please note that written or oral communications received by the Illinois Tollway in connection with this solicitation may be required to be reported to the Procurement Policy Board as required by law. This provision is not intended to prohibit communications with State employees regarding a procurement matter, but rather only requires reporting of those communications when they occur. Questions pertaining to the intent of the Contract Documents may be sent to the Illinois Tollway, attention jszabo@getipass.com, to be received no later than 2:00 p.m. local time on January 16, 2020. A completed Questionnaire and a statement of Current Contractual Obligations on forms supplied by the Illinois Tollway will be required from the apparent low Bidder once the apparent low Bidder is determined. Each Bid must be accompanied by a Bid Guaranty in the amount of five (5%) per cent of the total amount shown in the Bid for the Contract. The Bid Guaranty shall be in the form of an acceptable bid bond or a bank draft, certified check or cashier's check drawn on a solvent bank made payable to the Illinois State Toll Highway Authority. Award of the above Contract, if any award be made, will be to the lowest responsive and responsible Bidder or Bidders. The Illinois Tollway reserves the right to reject any and all Bids, to waive technicalities, or cancel the solicitation. MBE : 6.9% Wbe : 6.3%

21 Record(s)

Subscribe to Get All Contact Details

Trades

Division 00 - Lorem Ipsum

Division 00 - Lorem Ipsum

Lorem, Ipsum, Dolor, Sit amet
Subscribe to See All Trade Details

You’ve Reached the Free View Limit

Want to see more project and bidder data in your market? Check out our product options and see what works best for you and your business.

Come back in [[refresh_days]] to get [[project_count]] more free projects.