Access Denied!!!

It appears that you are using a private browser which blocks some scripts necessary for this page to function properly. As a result, you may experience limited functionality or the page may not work at all.

To access this page, please consider using a different browser or switch to the standard version of Firefox.

Thank you for your understanding.

Access Full Project

Publicly Funded

Privately Funded

Bidding Soon

Documents Available

Addenda Available

Post-Bid

Post-Bid

Saving Project...

Full details on over 250,000 Projects including 2000 updated daily available to subscribers

August 7, 2023

October 26, 2023

October 15, 2025

Redstone Rd

Renovation

No Information to Display

No Information to Display

Public - Federal

img_map_placeholder

Redstone Rd, Patrick Air Force Base, FL

Subscribe to View Full Documents

This project is to repair, modernize, and re-configure this 80-year-old two-story open bay hangar facility (B750) to support the current needs of 920th multi-maintenance and administrative functions. Major features of work include removing and replacing the HVAC systems; renovating restrooms; removing all unnecessary interior walls to provide a code compliant open-office concept; replacing flooring, stair treads, and ceiling tile; repainting all interior walls; and replacing light fixtures and ducts; installing additional communication/electrical outlets as required; reconfiguring and replacing interior utilities such as power, lighting, plumbing and fixtures, HVAC, fire suppression, and communications support; balancing HVAC system upon completion of the project; installing bird netting; installing high capacity fans; and prepare/seal/restripe floor in the bay area; painting exterior; providing elevator on north side for code compliance; refurbish both the East and West hangar doors; replace the second story roof; completing the fire hydrant line loop around the hangar footprint; expanding shop footprint to the south by 3,100SF (New Work); including space in Mech rooms for dehumidification equipment. This project will also include the replacement of approximately 2,700 SF of airfield pavement. Total renovation square footage is approximately 71,624 SF. Total new work/ expansion square footage is 3,100SF. But not limited to please review the specifications for more information. Prevailing Wages Apply. Contract duration = 720 calendar days

28 Record(s)

Subscribe to Get All Contact Details

Trades

Division 00 - Lorem Ipsum

Division 00 - Lorem Ipsum

Lorem, Ipsum, Dolor, Sit amet
Subscribe to See All Trade Details

You’ve Reached the Free View Limit

Want to see more project and bidder data in your market? Check out our product options and see what works best for you and your business.

Come back in [[refresh_days]] to get [[project_count]] more free projects.

Related Projects