Access Denied!!!

It appears that you are using a private browser which blocks some scripts necessary for this page to function properly. As a result, you may experience limited functionality or the page may not work at all.

To access this page, please consider using a different browser or switch to the standard version of Firefox.

Thank you for your understanding.

Access Full Project

Publicly Funded

Privately Funded

Bidding Soon

Documents Available

Addenda Available

Post-Bid

Post-Bid

Saving Project...

Full details on over 250,000 Projects including 2000 updated daily available to subscribers

February 5, 2020

March 1, 2020

November 30, 2020

Multiple Locations

Paving, Site Work

No Information to Display

$4,985,028.00

Public - County

img_map_placeholder

Multiple Locations, Cottage Grove, MN

63

1

15

7

Subscribe to View Full Documents

Project work includes excavation/earth moving, installation of over 1.1 miles of 72" diameter storm sewer pipe, construction of storm sewer structures, minor rural roadway reconstruction, and temporary and permanent erosion control. Specific work is as follows: 1. Mobilize labor, equipment, materials, and temporary facilities. 2. Install safety measures, establish limits of construction, adjust the construction fencing, and protect all existing utilities and structures. 3. Install erosion control items and test existing topsoil. 4. Strip and stockpile topsoil. 5. Common excavation for placement of bedding and installation of storm sewer pipe and structures. 6. Construct bypass at 80th Street South. 7. Remove 80th Street South roadway and bedding. 8. Construct storm sewer pipe and structures. 9. Backfill storm sewer pipe and structures. 10. Reconstruct 80th Street South. 10. Test, amend (if necessary), then replace topsoil. 11. Site restoration, including TRM in the southern channel. 12. Demobilize from the site after work is complete. Note: staging of this work should not be based on the order of the above work items. Direct inquiries to the Engineer's Project Manager Sam Westlund at (763) 475-0010. Bid Security in the amount of 5 percent of the amount of the Bid must accompany each Bid. The Owner reserves the right to retain the deposits of the 3 lowest Bidders for a period not to exceed 90 days after the date and time set for the Opening of Bids. No Bids may be withdrawn for a period of 60 days after the date and time set for the Opening of Bids. The Owner reserves the right to reject any and all Bids, to waive irregularities and informalities therein, and further reserves the right to award the Contract to the best interests of the District.

61 Record(s)

Subscribe to Get All Contact Details

Trades

Division 00 - Lorem Ipsum

Division 00 - Lorem Ipsum

Lorem, Ipsum, Dolor, Sit amet
Subscribe to See All Trade Details

You’ve Reached the Free View Limit

Want to see more project and bidder data in your market? Check out our product options and see what works best for you and your business.

Come back in [[refresh_days]] to get [[project_count]] more free projects.

Related Projects