Access Denied!!!

It appears that you are using a private browser which blocks some scripts necessary for this page to function properly. As a result, you may experience limited functionality or the page may not work at all.

To access this page, please consider using a different browser or switch to the standard version of Firefox.

Thank you for your understanding.

Access Full Project

Publicly Funded

Privately Funded

Bidding Soon

Documents Available

Addenda Available

Post-Bid

Post-Bid

Saving Project...

Full details on over 250,000 Projects including 2000 updated daily available to subscribers

May 28, 2020

June 29, 2020

September 27, 2020

700 E Jones St

Site Work

No Information to Display

$44,860.00

Public - City

img_map_placeholder

700 E Jones St, Milwaukee, WI

Subscribe to View Full Documents

The project contemplated herein consists of the Contractor replacing a 6-inch mud valve, coring and replacing approximately 20 linear feet of 6-inch drain piping from the mud valve to the catch basin outside and excavating and replacing approximately 20 linear feet of 8-inch sewer piping from the catch basin to the manhole including connections, testing, backfill and surface restoration. Location / Site Directions: Veolia Water Milwaukee LLC, Jones Island Water Reclamation Facility,700 East Jones Street Milwaukee, WI 53207 The overall SWMBE goal is twenty (20) percent. One SWMBE may provide full participation

31 Record(s)

Subscribe to Get All Contact Details

Trades

Division 00 - Lorem Ipsum

Division 00 - Lorem Ipsum

Lorem, Ipsum, Dolor, Sit amet
Subscribe to See All Trade Details

You’ve Reached the Free View Limit

Want to see more project and bidder data in your market? Check out our product options and see what works best for you and your business.

Come back in [[refresh_days]] to get [[project_count]] more free projects.

Related Projects