Access Denied!!!

It appears that you are using a private browser which blocks some scripts necessary for this page to function properly. As a result, you may experience limited functionality or the page may not work at all.

To access this page, please consider using a different browser or switch to the standard version of Firefox.

Thank you for your understanding.

Access Full Project

Publicly Funded

Privately Funded

Bidding Soon

Documents Available

Addenda Available

Post-Bid

Post-Bid

Saving Project...

Full details on over 250,000 Projects including 2000 updated daily available to subscribers

September 7, 2023

November 7, 2023

April 2, 2026

1600 Gest St

Renovation, Site Work

No Information to Display

$10,307,000.00

Public - City

img_map_placeholder

1600 Gest St, Cincinnati, OH

Subscribe to View Full Documents

The Standby Power project will upgrade critical standby power generating and distribution assets at the Mill Creek WWTP. The Loop project will upgrade critical MSD owned high and medium voltage assets within the existing 4.16kV and 13.2kV distribution loop at the Mill Creek WWTP. Question Deadline 07/21/2023 at 12:00 PM ET No bidder may withdraw its bid within sixty (60) days after the bid opening. Bids and award of contract may be held by the City for a period not to exceed sixty (60) days from the date of bid opening, for the purpose of reviewing the bids and investigating the qualifications of the Bidder in accordance with the Contract Documents. This project will utilize Water Pollution Control Loan Fund (WPCLF) funding. As such, as a condition of receiving capitalization grants from U.S. EPA for the WPCLF and the Water Supply Revolving Loan Account (WSRLA), the Ohio EPA negotiates 'fair share' Disadvantaged Business Enterprises (DBE) objectives with U.S. EPA. The current negotiated goals for construction related activities are 1.3% of all contracts to MBEs and 1.0% of all contracts to WBEs. Bidders are cautioned to read, understand, and complete the WPCLF forms in their entirety. Failure to do so may render the bid non-responsive. All bidders will also be subject to the provisions of the Contract Compliance Program regarding equal employment opportunity and to the project's applicable labor wage rate. The City shall neither accept nor be liable for any increase in costs, or other expenses, delay, loss, or subsequent ineligibility to contract with the City, incurred by a contractor as a result of the City rejecting any proposed person, firm, partner, principal, affiliate, subcontractor or supplier that is debarred or suspended after the submission of a bid, proposal, or other communication leading to a contract, but before the approval or award of the contract.

14 Record(s)

Subscribe to Get All Contact Details

Trades

Division 00 - Lorem Ipsum

Division 00 - Lorem Ipsum

Lorem, Ipsum, Dolor, Sit amet
Subscribe to See All Trade Details

You’ve Reached the Free View Limit

Want to see more project and bidder data in your market? Check out our product options and see what works best for you and your business.

Come back in [[refresh_days]] to get [[project_count]] more free projects.