Access Denied!!!

It appears that you are using a private browser which blocks some scripts necessary for this page to function properly. As a result, you may experience limited functionality or the page may not work at all.

To access this page, please consider using a different browser or switch to the standard version of Firefox.

Thank you for your understanding.

Access Full Project

Publicly Funded

Privately Funded

Bidding Soon

Documents Available

Addenda Available

Post-Bid

Post-Bid

Saving Project...

Full details on over 250,000 Projects including 2000 updated daily available to subscribers

October 27, 2023

December 26, 2023

February 15, 2025

2711 Big Valley Rd

Renovation

No Information to Display

$1,000,000.00

Public - City

img_map_placeholder

2711 Big Valley Rd, Copperas Cove, TX

Subscribe to View Full Documents

UV disinfection improvements - new UV and Parshall Flume structure, including all associated treatment process equipment, piping, valves, gates, appurtenances, structures, electrical, instrumentation, and miscellaneous site improvements. Any questions or requests for clarification must be submitted to Lockwood, Andrews & Newnam, Inc., prior to 10/19/2023 12:00:00 PM CST via CivCast to Jeremy N. Nakashima, PE., with subject line containing bid number and description. There will be no exceptions. All responses to the questions will be sent to all known bidders. Any requests received after this date and time will not be responded to Project Overview: The Work of this Contract involves modifications to the Copperas Cove South Wastewater Treatment Plant, including demolition of some existing facilities, renovations of existing facilities and the construction of new facilities. B. Demolition shall be conducted by the Contractor to ready the site for Work, but shall be scheduled to not remove those process units from the treatment train that are required for operation of the plant in order to meet the TPDES permit requirements and process sludge (see Section 01 35 13 - Special Project Procedures). Demolition activities include: 1. Abandoned NPW HP tank, concrete pad, and canopy to be demolished. 2. Existing concrete pads to be demolished as shown on the Drawings. 3. Top section of MH-A to be removed. 4. Existing UV disinfection equipment and electrical. 5. Temporary removal of handrail, steps, and sidewalk. 6. Miscellaneous piping, equipment and structures as shown on the Drawings C. Construction activities in the base bid include construction of: 1. Construction of a new UV and Parshall flume structure, including a canopy over the UV equipment electrical cabinets. 2. Installation of new UV disinfection and 12-inch Parshall flume equipment and associated electrical and instrumentation equipment. 3. Effluent transfer piping from the existing final clarifier effluent channel to the new UV structure, including hydraulic control gates. 4. Site improvements: To include all required upgrades to yard and utility piping, underground power and communications lines, site improvements, site grading and road improvements. 1.3 CONTRACT METHOD A. The Work hereunder will be constructed under a single lump sum contract.

56 Record(s)

Subscribe to Get All Contact Details

Trades

Division 00 - Lorem Ipsum

Division 00 - Lorem Ipsum

Lorem, Ipsum, Dolor, Sit amet
Subscribe to See All Trade Details

You’ve Reached the Free View Limit

Want to see more project and bidder data in your market? Check out our product options and see what works best for you and your business.

Come back in [[refresh_days]] to get [[project_count]] more free projects.

Related Projects