Access Denied!!!

It appears that you are using a private browser which blocks some scripts necessary for this page to function properly. As a result, you may experience limited functionality or the page may not work at all.

To access this page, please consider using a different browser or switch to the standard version of Firefox.

Thank you for your understanding.

Access Full Project

Publicly Funded

Privately Funded

Bidding Soon

Documents Available

Addenda Available

Post-Bid

Post-Bid

Saving Project...

Full details on over 250,000 Projects including 2000 updated daily available to subscribers

September 12, 2024

October 28, 2024

December 15, 2025

PA-36

Demolition, New Construction, Paving, Site Work

No Information to Display

$7,434,773.00

Public - State/Provincial

img_map_placeholder

PA-36, Altoona, PA

213

9

38

5

Subscribe to View Full Documents

This project is the bridge replacement on PA 36 over Mill Run near the intersection of 31st Street and resurfacing on PA 36 from SR 1009 (Frankstown Road) to SR 4005 (Mill Run Road), on Beale Avenue from 24th Street to Union Avenue, and on Union Avenue from Beale Avenue to PA 36 in City of Altoona and Logan Township, Blair County. The project includes the addition of a left turn lane, intersection modifications, paving of the roadway approaches, sign upgrades, pavement marking upgrades, guide rail upgrades, drainage improvements, high friction surface treatment, ADA upgrades, and tree removal/trimming, as indicated on the approved drawings included in the bid package for State Route 0036, Sections 31b and 034, in Blair County City of Altoona and Logan Township From Approximately Segment 0360 Offset 1394 to Approximately Segment 0500 Offset 2628. Project Cost Range: $5,000,000.00 - $7,499,999.99 Federal Project Status: PENNDOT Oversight Non-NHS Structure Work: 13.00% Pre-bid Meeting: None Wage Rates: Yes Prequalification Requirement: Yes State Type of Work: Bridge Replacement Responses to questions on this page are for informational and clarification purposes. Official changes to the proposal will be made via an Addendum. The deadline for submitting questions is 72 hours before the let date and time. For Emergency projects, the deadline is reduced to 19 hours before the let date and time. PennDOT - PA 36 Mill Run Bridge *The value for this project is based on a financial range. The value is listed as the highest possible cost from the range provided by a stakeholder or official project document.

35 Record(s)

Subscribe to Get All Contact Details

Trades

Division 00 - Lorem Ipsum

Division 00 - Lorem Ipsum

Lorem, Ipsum, Dolor, Sit amet
Subscribe to See All Trade Details

You’ve Reached the Free View Limit

Want to see more project and bidder data in your market? Check out our product options and see what works best for you and your business.

Come back in [[refresh_days]] to get [[project_count]] more free projects.

Related Projects