Access Denied!!!

It appears that you are using a private browser which blocks some scripts necessary for this page to function properly. As a result, you may experience limited functionality or the page may not work at all.

To access this page, please consider using a different browser or switch to the standard version of Firefox.

Thank you for your understanding.

Access Full Project

Publicly Funded

Privately Funded

Bidding Soon

Documents Available

Addenda Available

Post-Bid

Post-Bid

Saving Project...

Full details on over 250,000 Projects including 2000 updated daily available to subscribers

August 31, 2023

October 31, 2023

No Information to Display

118 Arizona St

New Construction, Site Work

No Information to Display

$2,000,000.00

Public - City

img_map_placeholder

118 Arizona St, Bisbee, AZ

Subscribe to View Full Documents

New City Hall for the City of Bisbee at 118 Arizona Street, Bisbee, Arizona Two story wood frame and stucco building of approximately 11,256 square feet. A. Utilities: Electrical, Telephone, and Cable are in east alley, Water and Sewer are on site, new fire line to be installed from Arizona Street, there is no Gas in the project. B. Site Limitations: Very small site with access from Tener Avenue and east alley. Area is residential and must not be impacted by offsite activities. Work hours shall be from 6:00 a.m. through 8:00 p.m. Monday through Friday. Exceptions to established working hours must be approved by the Project Manager. C. Parking: Limited parking on streets. Spaces must be left open for adjacent businesses. Additional parking is available on vacant lot at the southeast corner of Tener Avenue and Powell Street - a block away. D. Storage: The parking lane on Arizona Street in front of the site will be blocked off. Other offsite secure storage will be identified. Limited secure storage can be made available in vacant City building. E. Temporary Office: A temporary office at the site will be required for keeping permitted plans, shop drawings, and other project information. F. Sanitary Facilities: Compliant portable toilets must be provided. G. Traffic Control: As required, with assistance by the Bisbee Police Department if needed. H. Protection of adjacent areas and facilities: There is a close residence to the south that shall be screened from construction activities. I. Dust Control: Per City of Bisbee and OSHA regulations. J. SWPPP: Not Required Further Questions must be submitted in writing by email to the Project Manager no later than Thursday, August 10 at 4:00 PM. BISBEE, however, reserves the right to accept or reject any or all bids, to waive any informality or irregularity in the bids received or to withhold the award for any reason BISBEE determines.

21 Record(s)

Subscribe to Get All Contact Details

Trades

Division 00 - Lorem Ipsum

Division 00 - Lorem Ipsum

Lorem, Ipsum, Dolor, Sit amet
Subscribe to See All Trade Details

You’ve Reached the Free View Limit

Want to see more project and bidder data in your market? Check out our product options and see what works best for you and your business.

Come back in [[refresh_days]] to get [[project_count]] more free projects.