Access Denied!!!

It appears that you are using a private browser which blocks some scripts necessary for this page to function properly. As a result, you may experience limited functionality or the page may not work at all.

To access this page, please consider using a different browser or switch to the standard version of Firefox.

Thank you for your understanding.

Access Full Project

Publicly Funded

Privately Funded

Bidding Soon

Documents Available

Addenda Available

Post-Bid

Post-Bid

Saving Project...

Full details on over 250,000 Projects including 2000 updated daily available to subscribers

No Information to Display

March 1, 2021

No Information to Display

Multiple Locations

Site Work

No Information to Display

No Information to Display

Public - City

img_map_placeholder

Multiple Locations, Columbus, OH

Plans and Specifications are not available for this project. If that changes, they will be made available here.

Subscribe to View Full Documents

The City of Columbus, Department of Public Utilities (DPU), Division of Sewer & Drainage (DOSD) is soliciting proposals to provide professional design services for the OSIS/BWARI/BWOAS Large Diameter Sewer Assessment. Work items for the initial phase of the project shall consist of closed circuit televising and sonar to assess the structural and operational condition of the large diameter trunk sewers identified on the project Exhibit, the providing of an Technical Memorandum outlining the structural and operational conditions of the sewers, and all other necessary items for the completion of the Memorandum. No pre-proposal meeting will be held. Direct questions via e-mail only to: Contract Manager, DPUCapitalRFP@columbus.gov. No contact is to be made with the City other than with the Contract Manager through e-mail with respect to this proposal or its status. The deadline for questions is October 16, 2019 end of business. The method of contractor selection has not been determined at this time. As of October 15, 2020, a design firm has been selected. However, information regarding design firm and general contractor selection has not been disclosed. , the method of contractor has not yet been selected. A construction timeline has not been disclosed. *Project information, including timeline and contacts, has been obtained through public sources. The content management team continues to pursue additional details; however, the contact(s) listed have yet to disclose or confirm any information. Inquiries should be directed to the contact(s) listed.

2 Record(s)

Subscribe to Get All Contact Details

Trades

Division 00 - Lorem Ipsum

Division 00 - Lorem Ipsum

Lorem, Ipsum, Dolor, Sit amet
Subscribe to See All Trade Details

You’ve Reached the Free View Limit

Want to see more project and bidder data in your market? Check out our product options and see what works best for you and your business.

Come back in [[refresh_days]] to get [[project_count]] more free projects.