Access Denied!!!

It appears that you are using a private browser which blocks some scripts necessary for this page to function properly. As a result, you may experience limited functionality or the page may not work at all.

To access this page, please consider using a different browser or switch to the standard version of Firefox.

Thank you for your understanding.

Access Full Project

Publicly Funded

Privately Funded

Bidding Soon

Documents Available

Addenda Available

Post-Bid

Post-Bid

Saving Project...

Full details on over 250,000 Projects including 2000 updated daily available to subscribers

September 26, 2019

October 21, 2019

November 30, 2019

Babbs Rd

Paving, Site Work

No Information to Display

$117,832.00

Public - City

img_map_placeholder

Babbs Rd, West Suffield, CT

Subscribe to View Full Documents

The project was awarded to Rolocut Construction LLC amount of $117,832.30 .. Project will start this Oct 21st and end November 30th. The project involves the installation of 540 feet of 12" ductile iron water main, 330 feet of 6" ductile iron fire service main and 330 feet of 2" copper domestic service pipe along with a hydrant assembly, valves, a meter pit and appurtenances. The work will also include the restoration of driveway and grass areas disturbed by the water main construction. As the project involves an extension of the Aquarion Water Company system, Aquarion personnel shall be involved in inspection and perform testing and disinfection operations. Questions may be directed to Gerald Turbet, P.E., Town Engineer at (860) 668-3876 (Email gturbet@suffieldct.gov). Bids must be accompanied by a Bid Bond, payable to the Town of Suffield, in the amount of 5% of the bid total as a guarantee. A certified check will not be accepted in lieu of a Bid Bond. No proposal will be accepted unless accompanied by the required bid bond. The Town reserves the right to waive any informality or to reject any or all bids should it be in the Town's best interest to do so. The Contractor chosen for the project shall be required to furnish 100% Performance and Labor and Material bonds and proof of required insurance coverage and shall be approved for the project by Aquarion Water Company. All work under this project shall be subject to the Suffield Code of Ethics. The project is funded by Town funds and a $75,000 DEEP grant, which are in place. No bid may be withdrawn for a period of 30 days after the actual date of opening. The time frame for work on this project is 45 days. The Town of Suffield is an affirmative action and equal opportunity employer. Minority/Women's Business Enterprises are encouraged to apply. Estimated project Value: 110,000-140,000 The Contractor shall supply all labor, equipment and materials to construct the water main extension and service connections as described in this bid package and shown on attached plans.

15 Record(s)

Subscribe to Get All Contact Details

Trades

Division 00 - Lorem Ipsum

Division 00 - Lorem Ipsum

Lorem, Ipsum, Dolor, Sit amet
Subscribe to See All Trade Details

You’ve Reached the Free View Limit

Want to see more project and bidder data in your market? Check out our product options and see what works best for you and your business.

Come back in [[refresh_days]] to get [[project_count]] more free projects.