Access Denied!!!

It appears that you are using a private browser which blocks some scripts necessary for this page to function properly. As a result, you may experience limited functionality or the page may not work at all.

To access this page, please consider using a different browser or switch to the standard version of Firefox.

Thank you for your understanding.

Access Full Project

Publicly Funded

Privately Funded

Bidding Soon

Documents Available

Addenda Available

Post-Bid

Post-Bid

Saving Project...

Full details on over 250,000 Projects including 2000 updated daily available to subscribers

June 30, 2025

October 21, 2019

December 20, 2019

1087 W 2nd St

Renovation

No Information to Display

$100,938.00

Public - County

img_map_placeholder

1087 W 2nd St, Xenia, OH

Documents for this project are exclusively Specifications. If Plans become available, we will add them here.

Subscribe to View Full Documents

Enclosed you will find work specifications from Tri-Tech Associates Inc. If you would like to submit a bid, please review the specifications and submit a bid, including a bid bond, on the enclosed specification sheet. Also enclosed are the current prevailing wage rates that must be paid. Each bidder must insure that all employees and applicants for employment are not discriminated against because of race, color, religion, handicap, age, familial status, sex, or national origin. If, at the time of this contract is to be awarded, the lowest and most responsive base bid submitted by a responsible bidder does not exceed the amount of funds then estimated by the Greene County Board of Commissioners as available to finance the contract, the contract will be awarded on the base bid only. If such a bid exceeds such amount the Greene County Board of Commissioners may reject all bids or may award the contract on the base bid combined with such deductible alternates applied in numerical order in which they are listed in the Form of Bid, as produces a net amount which is within the available funds. The contractor shall comply with the laws of the State of Ohio relating to insurance coverage and shall carry during the performance of this contract, and keep in full force, Workers' Compensation Insurance. A copy of the document evidencing said Workers' Compensation coverage shall be furnished to the Greene County Board of Commissioners upon request. The contractor agrees to obtain and maintain, at their expense, at all times throughout the term of this contract, a policy of professional liability and commercial general liability insurance with an insurance company licensed in the State of Ohio. The policy shall have limits of not less than one million ($1,000,000) per occurrence and two million ($2,000,000) aggregate to cover any loss, liability or damage alleged to have been committed by the contractor or the contractor's agents, servants, or employees. If operation of an automobile occurs in commencement of services by the performance of this contract, the automobile liability insurance shall be mandatory in the amount of one million ($1,000,000) per occurrence and tow million ($2,000,000) aggregate. All policies shall name the Board of Greene County Commissioners and the contracting Department as additional insured. This work is also subject to the conditions for contractors in the U.S. Department of Housing and Urban Development, Community Development Program and Executive Order 11246 as amended. Executive Order 11246, entitled "Equal Employment Opportunity," as amended by Executive Order 11375, and as supplemented in the U.S. Department of Labor regulations (41CFR, Part 60.) The estimated cost to fully suppress the building is $160,000.

8 Record(s)

Subscribe to Get All Contact Details

Trades

Division 00 - Lorem Ipsum

Division 00 - Lorem Ipsum

Lorem, Ipsum, Dolor, Sit amet
Subscribe to See All Trade Details

You’ve Reached the Free View Limit

Want to see more project and bidder data in your market? Check out our product options and see what works best for you and your business.

Come back in [[refresh_days]] to get [[project_count]] more free projects.