Access Denied!!!

It appears that you are using a private browser which blocks some scripts necessary for this page to function properly. As a result, you may experience limited functionality or the page may not work at all.

To access this page, please consider using a different browser or switch to the standard version of Firefox.

Thank you for your understanding.

Access Full Project

Publicly Funded

Privately Funded

Bidding Soon

Documents Available

Addenda Available

Post-Bid

Post-Bid

Saving Project...

Full details on over 250,000 Projects including 2000 updated daily available to subscribers

August 24, 2023

October 10, 2023

October 12, 2027

I-83

Demolition, New Construction, Outdoor Lighting, Paving, Site Work

No Information to Display

$125,000,000.00

Public - State/Provincial

img_map_placeholder

I-83, Harrisburg, PA

Subscribe to View Full Documents

The Sr 0083 Section 079 Project Extends on I-83 From the 19th Street (Sr 3007) Interchange to 29th Street (Sr 3013) and Consists of the Widening and Reconstruction of an Existing 24 Foot Cement Concrete and Bituminous Roadway, Consisting of New Superpave Pavement 36 Feet in Width and Full Depth Paved Shoulders, 24 Foot Collector Distributor Roadways, Accel/decel Lanes, Ramps and Sideroads, Upgrade to the 19th Street (Sr 3007) Partial Interchange and One New Full Interchange at Cameron Street (Sr 0230), and Removal of One Existing Full Interchange at 13th Street. Roadway and Structure Improvements Are Included on Cameron Street (Sr 0230), 19th Street (Sr 3007) and 29th Street (Sr 3013). Also Included Are: Embankment Benching and Sliver Fills, Replacement of a One-span Bridge and a Two-span Bridge With a Proposed Three-span Bridge, Replacement of a Two-span Bridge With a Proposed One-span Bridge, Replacement of a One-span Bridge With a Proposed Two-span Bridge, Removal of a Three-span Bridge and Replacement With Embankment, Removal of Portions of Existing Bridges, Five Proposed Retaining Walls, One Proposed Retaining Wall With Structure Mounted Sound Barrier, Two Proposed Ground Mounted Sound Barriers, Two Proposed Moment Slabs With Toe Walls, Four Proposed Overhead Sign Structures, Guiderail, Drainage, Pollinator Garden, Highway Lighting, Pavement Markings, and Other Miscellaneous Construction, All Contained Within an Overall Project Length of 9,950.00 Linear Feet (1.884 Miles) as Indicated on the Approved Drawings Included in the Bid Package for State Route 0083, Section 079, in Dauphin County, City of Harrisburg, Swatara Township, Paxtang Borough, From a Point 800 Feet West of the Cameron Street Underpass at Segment 0424/0425 Offset 0974/0974 to the 29th Street Overpass at Segment 0444/0445 Offset 1432/1406. Project Cost Range: $100,000,000.00 - $124,999,999.99 Federal Project Status: Federal Oversight Structure Work: 26.00% Pre-bid Meeting: None Wage Rates: Yes Prequalification Requirement: Yes State Type of Work: Highway Reconstruction Responses to questions on this page are for informational and clarification purposes. Official changes to the proposal will be made via an Addendum. The deadline for submitting questions is 72 hours before the let date and time. For Emergency projects, the deadline is reduced to 19 hours before the let date and time. PennDOT - I-83 East Shore Section 3 *The value for this project is based on a financial range. The value is listed as the highest possible cost from the range provided by a stakeholder or official project document.

29 Record(s)

Subscribe to Get All Contact Details

Trades

Division 00 - Lorem Ipsum

Division 00 - Lorem Ipsum

Lorem, Ipsum, Dolor, Sit amet
Subscribe to See All Trade Details

You’ve Reached the Free View Limit

Want to see more project and bidder data in your market? Check out our product options and see what works best for you and your business.

Come back in [[refresh_days]] to get [[project_count]] more free projects.

Related Projects