Access Denied!!!

It appears that you are using a private browser which blocks some scripts necessary for this page to function properly. As a result, you may experience limited functionality or the page may not work at all.

To access this page, please consider using a different browser or switch to the standard version of Firefox.

Thank you for your understanding.

Access Full Project

Publicly Funded

Privately Funded

Bidding Soon

Documents Available

Addenda Available

Post-Bid

Post-Bid

Saving Project...

Full details on over 250,000 Projects including 2000 updated daily available to subscribers

September 23, 2019

November 22, 2019

June 11, 2021

1313 N Burning Bush Ln

Paving, Site Work

No Information to Display

No Information to Display

Public - City

img_map_placeholder

1313 N Burning Bush Ln, Mount Prospect, IL

Subscribe to View Full Documents

The project includes, but is not limited to the following bid items: curb and gutter removal, curb and gutter, full-depth HMA pavement patching, concrete sidewalk removal, concrete sidewalk, storm sewer, earth excavation for a detention basin, topsoil and seeding, short segmental concrete block walls, ADA ramps, stairs, railings, irrigation system, irrigation water system [water service pipes from water main or water well (shallow or deep)], HMA path removal, HMA path, tree removal, trees, ballfield fencing/backstops, benches, temporary erosion control, temporary dewatering/bypass pumping, access management, traffic maintenance, as well as all incidental and collateral work necessary to complete the project as shown on the plans and as described herein. The Work shall be constructed in accordance with the Levee 37: Burning Bush Trails Park Interior Drainage Improvement Project. The prime Contractor must be IDOT pre-qualified in Drainage and/or Earthwork. Any Bid submitted unsealed, unsigned, sent via email or fax or received subsequent to the aforementioned date and time, will be disqualified and returned to the bidder. The Village reserves the right in its sole discretion, to reject any and all bids or parts thereof, to waive any irregularities technicalities and informalities in bid procedures and to award the contract in a manner best serving the interests of the Village. The MBE goal is 20%, the WBE goal is 10%, the SBE goal is 10%, and the VBE goal is 3%

13 Record(s)

Subscribe to Get All Contact Details

Trades

Division 00 - Lorem Ipsum

Division 00 - Lorem Ipsum

Lorem, Ipsum, Dolor, Sit amet
Subscribe to See All Trade Details

You’ve Reached the Free View Limit

Want to see more project and bidder data in your market? Check out our product options and see what works best for you and your business.

Come back in [[refresh_days]] to get [[project_count]] more free projects.

Related Projects