Access Denied!!!

It appears that you are using a private browser which blocks some scripts necessary for this page to function properly. As a result, you may experience limited functionality or the page may not work at all.

To access this page, please consider using a different browser or switch to the standard version of Firefox.

Thank you for your understanding.

Access Full Project

Publicly Funded

Privately Funded

Bidding Soon

Documents Available

Addenda Available

Post-Bid

Post-Bid

Saving Project...

Full details on over 250,000 Projects including 2000 updated daily available to subscribers

November 2, 2023

December 18, 2023

October 18, 2024

SR 1012

Paving, Site Work

No Information to Display

$2,500,000.00

Public - State/Provincial

img_map_placeholder

SR 1012, Milroy, PA

Subscribe to View Full Documents

The Description and Location of the Project is as Follows: for the Improvement of a Certain Section of State Highway in Mifflin County, Armagh Township, Commonwealth of Pennsylvania, State Route 1012, Section A02. The Project Being Situated as Follows: on State Route 1012 From Segment 0010/offset 0000 to Segment 0010/offset 0077 and on Township Road T-817 From Station 593+00 to Station 598+00 for a Total Construction Length of Approximately 491 Feet (.093 Miles) for the Removal of the Existing Two-span Steel I-beam Bridge and Construction of Its Replacement Two-span Composite Adjacent Box Beam Bridge. Construction Includes Superpave Asphalt Mixture Designs for the Base, Binder, and Wearing Courses, Drainage Items, Concrete Curb, Waterline Relocation, Sewer Line Relocation, Guide Rail, Pavement Markings and Miscellaneous Construction as Indicated on the Approved Drawings Included in the Bid Package. Project Cost Range: $1,000,000.00 - $2,499,999.99 Federal Project Status: PENNDOT Oversight Non-NHS Structure Work: 56.00% Pre-bid Meeting: None Wage Rates: Yes Prequalification Requirement: Yes State Type of Work: Bridge Replacement Responses to questions on this page are for informational and clarification purposes. Official changes to the proposal will be made via an Addendum. The deadline for submitting questions is 72 hours before the let date and time. For Emergency projects, the deadline is reduced to 19 hours before the let date and time. PennDOT - SR 1012 Laurel Run Br *The value for this project is based on a financial range. The value is listed as the highest possible cost from the range provided by a stakeholder or official project document. SR/SEC/Group ID: 1012/A02/LDR

23 Record(s)

Subscribe to Get All Contact Details

Trades

Division 00 - Lorem Ipsum

Division 00 - Lorem Ipsum

Lorem, Ipsum, Dolor, Sit amet
Subscribe to See All Trade Details

You’ve Reached the Free View Limit

Want to see more project and bidder data in your market? Check out our product options and see what works best for you and your business.

Come back in [[refresh_days]] to get [[project_count]] more free projects.

Related Projects