Access Denied!!!

It appears that you are using a private browser which blocks some scripts necessary for this page to function properly. As a result, you may experience limited functionality or the page may not work at all.

To access this page, please consider using a different browser or switch to the standard version of Firefox.

Thank you for your understanding.

Access Full Project

Publicly Funded

Privately Funded

Bidding Soon

Documents Available

Addenda Available

Post-Bid

Post-Bid

Saving Project...

Full details on over 250,000 Projects including 2000 updated daily available to subscribers

No Information to Display

November 1, 2023

No Information to Display

I-55

Demolition, New Construction, Site Work

No Information to Display

No Information to Display

Public - State/Provincial

img_map_placeholder

I-55, Springfield, IL

We’ve obtained documents for this project and are currently processing them.

Subscribe to View Full Documents

As of August 2 2023, construction documents are complete and under state review. Contractor bidding is expected to commence in October of 2023. A firm construction timeline has yet to be established. *The original solicitation is listed below for reference. --- Appropriated Amount: $800,000 Professional Liability Insurance Required: $1,750,000 Project Fee Classification: Group II R The Railsplitter Northbound Rest Area (D0687) is a 1,188 square foot, one-story building constructed in 1964. The Railsplitter Southbound Rest Area (D0688) is a 1,188 square foot, one-story building constructed in 1964. The Railsplitter Northbound Rest Area Vending Building (D0796) is a 447 square foot, one-story building constructed in 1998. The Railsplitter Southbound Rest Area Vending Building (D0795) is a 447 square foot, one-story building constructed in 1998 The scope of work provides for demolishing two existing main rest area buildings (D0687 and D0688) and two vending buildings (D0795 and D0796), including an analysis and design for connection to the city sewer system at the northbound location. The work provides for constructing two new public rest area facilities, two approximately 400 square foot garage storage buildings, new picnic areas, including shelters and two outdoor exercise/play areas. This work may include, but is not limited to architectural, geotechnical, civil, structural, electrical, mechanical, landscape design, and electrical services as needed. The work also provides for a new electrical service, if needed This project will be completed in two phases, beginning with the northbound location. Demolition and reconstruction of the northbound facility shall be complete prior to the start of phase two southbound work. New buildings shall be sited to preserve existing mature trees where possible and allow for maximum utilization of remaining property for parking areas. Parking areas and access sidewalks will be designed by IDOT and coordinated with building design and location. Building design and exterior landscaping shall reflect the significance of location and proximity to the State Capitol. All demolished materials, including sewage lagoons shall be removed from the site. The A/E will need to determine if any components of this project are eligible for a utility company or other energy grant/rebate and will be responsible for preparing and submitting the grant application if the project qualifies for the rebate. A combined MBE/WBE goal of 15 percent is applicable to the A/E team. A VBE goal of 3 percent is applicable to the A/E team. The interviews for this project are tentatively scheduled for September 25, 2019. The method of contractor selection has not been determined at this time

3 Record(s)

Subscribe to Get All Contact Details

Trades

Division 00 - Lorem Ipsum

Division 00 - Lorem Ipsum

Lorem, Ipsum, Dolor, Sit amet
Subscribe to See All Trade Details

You’ve Reached the Free View Limit

Want to see more project and bidder data in your market? Check out our product options and see what works best for you and your business.

Come back in [[refresh_days]] to get [[project_count]] more free projects.