Access Denied!!!

It appears that you are using a private browser which blocks some scripts necessary for this page to function properly. As a result, you may experience limited functionality or the page may not work at all.

To access this page, please consider using a different browser or switch to the standard version of Firefox.

Thank you for your understanding.

Access Full Project

Publicly Funded

Privately Funded

Bidding Soon

Documents Available

Addenda Available

Post-Bid

Post-Bid

Saving Project...

Full details on over 250,000 Projects including 2000 updated daily available to subscribers

December 4, 2019

January 3, 2020

December 27, 2020

Bethel Rd

Site Work

No Information to Display

No Information to Display

Public - City

img_map_placeholder

Bethel Rd, Columbus, OH

Plans and Specifications are not available for this project. If that changes, they will be made available here.

Subscribe to View Full Documents

**As of December 19, 2019, the project is already been awarded to CTL Engineering, Inc. for $57,550.71.** The work for which consists of storm sewer rehabilitation that includes approximately 154 LF of 84" storm , 74 LF of 24" storm and 138 LF of 18" storm sewer and other such work as may be necessary to complete the contract. Questions pertaining to the drawings and specifications must be submitted in writing only to the Division of Sewerage and Drainage via November 20, 2019 local time. Any questions regarding the bidding process may be sent electronically

42 Record(s)

Subscribe to Get All Contact Details

Trades

Division 00 - Lorem Ipsum

Division 00 - Lorem Ipsum

Lorem, Ipsum, Dolor, Sit amet
Subscribe to See All Trade Details

You’ve Reached the Free View Limit

Want to see more project and bidder data in your market? Check out our product options and see what works best for you and your business.

Come back in [[refresh_days]] to get [[project_count]] more free projects.