Access Denied!!!

It appears that you are using a private browser which blocks some scripts necessary for this page to function properly. As a result, you may experience limited functionality or the page may not work at all.

To access this page, please consider using a different browser or switch to the standard version of Firefox.

Thank you for your understanding.

Access Full Project

Publicly Funded

Privately Funded

Bidding Soon

Documents Available

Addenda Available

Post-Bid

Post-Bid

Saving Project...

Full details on over 250,000 Projects including 2000 updated daily available to subscribers

July 4, 2019

September 4, 2019

July 4, 2020

To Be Determined

Site Work

No Information to Display

$1,356,611.00

Public - State/Provincial

img_map_placeholder

To Be Determined, Faro, YT

Subscribe to View Full Documents

This project involves removal of the existing reservoir (which is reaching the end of its serviceable life) and construction of a new steel bolted tank (at the same site) with all associated mechanical, electrical and civil works. Also included: new insulated and heat traced interconnected piping between Treatment Building No. 2 and new tank, new Treatment Building No. 2 tank bypass; replacement of upstream piping from utilidor into Treatment Building No. 3 up to the new stainless steel flange; relocation of chlorine injection point within Treatment Building No. 2; and new retaining wall behind both reservoir tanks as well as fencing around the area.

75 Record(s)

Subscribe to Get All Contact Details

Trades

Division 00 - Lorem Ipsum

Division 00 - Lorem Ipsum

Lorem, Ipsum, Dolor, Sit amet
Subscribe to See All Trade Details

You’ve Reached the Free View Limit

Want to see more project and bidder data in your market? Check out our product options and see what works best for you and your business.

Come back in [[refresh_days]] to get [[project_count]] more free projects.

Related Projects