Access Denied!!!

It appears that you are using a private browser which blocks some scripts necessary for this page to function properly. As a result, you may experience limited functionality or the page may not work at all.

To access this page, please consider using a different browser or switch to the standard version of Firefox.

Thank you for your understanding.

Access Full Project

Publicly Funded

Privately Funded

Bidding Soon

Documents Available

Addenda Available

Post-Bid

Post-Bid

Saving Project...

Full details on over 250,000 Projects including 2000 updated daily available to subscribers

September 26, 2024

November 12, 2024

April 16, 2026

Park Ave

Demolition, New Construction, Paving, Site Work

No Information to Display

$2,500,000.00

Public - State/Provincial

img_map_placeholder

Park Ave, North Franklin Township, PA

87

11

40

4

Subscribe to View Full Documents

This Project Consists of the Replacement of the Bridge That Carries S.r. 0018 (Park Avenue) Over Chartiers Creek. Also Included Will Be Roadway Approach Work, Drainage Upgrades, Guide Rail Upgrades, Signing and Pavement Marking Upgrades, and Other Miscellaneous Construction, as Indicated on the Approved Drawings Included in the Bid Package for State Route 0018, Section Q10, in Washington County North Franklin Township From Approximately Two-hundred Thirty-five (235) Feet South of the Intersection of S.r. 0018 (Park Avenue) and T- 979 (Driftwood Drive) at Segment 0310 Offset 0266 to Approximately Four-hundred Eighty-four (484) Feet North of the Intersection of S.r. 0018 (Park Avenue) and T-979(Driftwood Drive) at Segment 0310 Offset 1015. Project Cost Range: $1,000,000.00 - $2,499,999.99 Federal Project Status: PENNDOT Oversight Non-NHS Structure Work: 48.00% Pre-bid Meeting: None Wage Rates: Yes Prequalification Requirement: Yes State Type of Work: Bridge Replacement Responses to questions on this page are for informational and clarification purposes. Official changes to the proposal will be made via an Addendum. The deadline for submitting questions is 72 hours before the let date and time. For Emergency projects, the deadline is reduced to 19 hours before the let date and time. PennDOT - PA 18 Over Chartiers Creek-2 *The value for this project is based on a financial range. The value is listed as the highest possible cost from the range provided by a stakeholder or official project document.

32 Record(s)

Subscribe to Get All Contact Details

Trades

Division 00 - Lorem Ipsum

Division 00 - Lorem Ipsum

Lorem, Ipsum, Dolor, Sit amet
Subscribe to See All Trade Details

You’ve Reached the Free View Limit

Want to see more project and bidder data in your market? Check out our product options and see what works best for you and your business.

Come back in [[refresh_days]] to get [[project_count]] more free projects.

Related Projects