Access Denied!!!

It appears that you are using a private browser which blocks some scripts necessary for this page to function properly. As a result, you may experience limited functionality or the page may not work at all.

To access this page, please consider using a different browser or switch to the standard version of Firefox.

Thank you for your understanding.

Access Full Project

Publicly Funded

Privately Funded

Bidding Soon

Documents Available

Addenda Available

Post-Bid

Post-Bid

Saving Project...

Full details on over 250,000 Projects including 2000 updated daily available to subscribers

No Information to Display

November 22, 2019

No Information to Display

18 Glenridge Rd

Service, Maintenance and Supply

No Information to Display

No Information to Display

Public - City

img_map_placeholder

18 Glenridge Rd, Schenectady, NY

Plans and Specifications are not available for this project. If that changes, they will be made available here.

Subscribe to View Full Documents

The Town of Glenville is issuing this Request for Proposals (RFP) to qualified individuals, professional service firms and/or consultant teams to undertake planning, feasibility and preliminary design work to develop multi-use pedestrian and bicycle trail system routes within the Town of Glenville. This project is being funded by the Town of Glenville and New York State Empire State Development. Significant in-kind staff support will also be provided by the Town of Glenville. The study has a fixed budget of $60,000 for consultant services. The Town of Glenville will administer the consultant contract and will jointly manage the study with New York State Empire State Development. Project Background & Purpose This project will utilize several adopted planning documents (see list of Existing Planning Documents below at end of this RFP) as the basis for preparation of a Glenville Greenway Strategic Development Plan. It is envisioned that this plan will establish the basis for implementation of a town-wide multi-use trail system linking employment, cultural, residential and recreational points of interest within Glenville to other similar venues in Schenectady, Saratoga and Montgomery counties. Available information contained within numerous adopted plans, studies and reports, along with personal information from Study Advisory Committee members and the public, will be utilized by the selected consultant to develop potential future Greenway Trail routes. Additionally, the consultant will be expected to prepare the following: trail segment cost estimates, a potential phasing plan, estimated figures for trail maintenance, potential funding sources, anticipated permitting requirements and draft language for including trail connections and development requirements within Glenville's Zoning Ordinance and Subdivision of Land regulations. Service-Disabled Veteran-Owned Set Aside: No Total MWBE Participation Goals: 30% The method of contractor selection has not been determined at this time.

3 Record(s)

Subscribe to Get All Contact Details

Trades

Division 00 - Lorem Ipsum

Division 00 - Lorem Ipsum

Lorem, Ipsum, Dolor, Sit amet
Subscribe to See All Trade Details

You’ve Reached the Free View Limit

Want to see more project and bidder data in your market? Check out our product options and see what works best for you and your business.

Come back in [[refresh_days]] to get [[project_count]] more free projects.