Access Denied!!!

It appears that you are using a private browser which blocks some scripts necessary for this page to function properly. As a result, you may experience limited functionality or the page may not work at all.

To access this page, please consider using a different browser or switch to the standard version of Firefox.

Thank you for your understanding.

Access Full Project

Publicly Funded

Privately Funded

Bidding Soon

Documents Available

Addenda Available

Post-Bid

Post-Bid

Saving Project...

Full details on over 250,000 Projects including 2000 updated daily available to subscribers

November 28, 2023

December 27, 2023

July 27, 2024

Kissimmee Dr

Paving, Site Work

No Information to Display

$500,000.00

Public - County

img_map_placeholder

Kissimmee Dr, Kissimmee, FL

Subscribe to View Full Documents

Pursuant to the Osceola County Procurement Code and all applicable Florida Statutes Osceola County is accepting sealed formal bids for the project known as the Construction Services for Kissimmee to St. Cloud Connector Trail Project (Federal-Aid Funded - LAP) FM#439067-1-58-01 / D522-077-B. Scope of Service: The proposed Kissimmee St. Cloud Connector Trail project is a 1.47-mile-long concrete shared-use path varying in width from 8 ft to 14 ft with approximately 80% of the trail at 14 ft wide. The pavement design for the path includes 4-inch, 6 inches, and 6 inch reinforced concrete. There is a 1,133 ft long section of the trail that runs through the Disston Sugarmill Ruins area, which is a protected area. There is no excavation or grubbing permitted in this area. The trail is to be constructed by laying down a geotextile fabric layer, placing and compacting 4 inches of recycled concrete aggregate base, and constructing 4 in thick concrete trail. Otherwise, this Ruins area is to remain undisturbed. There are four designated areas of subsoil excavation. There are four locations calling for the construction of concrete gravity walls. The plans include the construction of drainage features including 14 inlets, 6 manholes, 1 endwall, and 10 mitered end sections as well as 2,166 ft of drainage pipe. The plans call for the milling and resurfacing of the northbound lanes of Brown Chapel Rd. The appropriate traffic control will be in place for this roadway resurfacing operation. The plans include details for providing permanent tree protection barricades. The section of the trail under the US 192 (SR 500) bridge includes the addition of underdeck lighting. Note: there is no access to the trail project from US 192 to under the bridge. This project is a Federal-aid funded project through the Florida Department of Transportation (FDOT) Local Agency Program (LAP), (FM#439067-1-58-01 / D522-077-B). FDOT Pre-Qualification Requirements: The prime Contractor shall be Florida Department of Transportation (FDOT) Prequalified in the following Work Groups: 7. Drainage 10. Flexible Paving 11. Grading 12. Grassing, seeding and sodding 40. Sidewalk 40. Driveways The County reserves the right to reject any or all bids received in accordance with Section 3.4-5 of the Procurement Code. Rejections shall be for good cause, in whole or in part, and with proper notifications and documentation. The deadline for questions is Tuesday, July 25, 2023 at 12:00 PM Local Time. Contact: Don Gaskins (407) 742-0931. **American Persian Engineering And Construction requests sub bids no later than September 11, 2023.

74 Record(s)

Subscribe to Get All Contact Details

Trades

Division 00 - Lorem Ipsum

Division 00 - Lorem Ipsum

Lorem, Ipsum, Dolor, Sit amet
Subscribe to See All Trade Details

You’ve Reached the Free View Limit

Want to see more project and bidder data in your market? Check out our product options and see what works best for you and your business.

Come back in [[refresh_days]] to get [[project_count]] more free projects.

Related Projects