Access Denied!!!

It appears that you are using a private browser which blocks some scripts necessary for this page to function properly. As a result, you may experience limited functionality or the page may not work at all.

To access this page, please consider using a different browser or switch to the standard version of Firefox.

Thank you for your understanding.

Access Full Project

Publicly Funded

Privately Funded

Bidding Soon

Documents Available

Addenda Available

Post-Bid

Post-Bid

Saving Project...

Full details on over 250,000 Projects including 2000 updated daily available to subscribers

No Information to Display

June 3, 2024

March 2, 2026

Denison Ave & Dundas St W

New Construction, Outdoor Lighting, Site Work

No Information to Display

$10,000,000.00

Public - County

img_map_placeholder

Denison Ave & Dundas St W, Toronto, ON

We’ve obtained documents for this project and are currently processing them.

Subscribe to View Full Documents

Phase 2A of the Alexandra Park Revitalization. The scope includes two blocks of 21 new townhouses to the current phase of the Alexandra Park revitalization. The project will have one block of five units and one block of 16 units. townhouse pilot will have some additional high-performance features: Decarbonized heating and cooling system, the units will be supplied with state-of-the-art Air Source Variable Refrigerant Flow (ASVRF) systems which do not burn gas, and do not emit carbon or other Green House Gases (GHG) in their operation. Better than typical ventilation with heat recovery means residences are supplied with more consistent fresh air to combat common illnesses arising from poor indoor air quality and mold. Stormwater Bio-retention is a system where parts of the townhouse landscaping such as gardens and street tree beds are designed to do double duty by acting as a cistern for water from a 100-year storm event, as these become far more frequent. TIMELINE: The architect was awarded and is undertaking design of the Passive House Elements for future phases of Alexandra Park Revitalization. Working drawings are underway. The construction manager for the Alexandra Park project will manage construction, sub trade tenders will proceed by invitation. Construction is slated to begin in 2024 and be completed for the beginning of 2026.

6 Record(s)

Subscribe to Get All Contact Details

Trades

Division 00 - Lorem Ipsum

Division 00 - Lorem Ipsum

Lorem, Ipsum, Dolor, Sit amet
Subscribe to See All Trade Details

You’ve Reached the Free View Limit

Want to see more project and bidder data in your market? Check out our product options and see what works best for you and your business.

Come back in [[refresh_days]] to get [[project_count]] more free projects.