Access Denied!!!

It appears that you are using a private browser which blocks some scripts necessary for this page to function properly. As a result, you may experience limited functionality or the page may not work at all.

To access this page, please consider using a different browser or switch to the standard version of Firefox.

Thank you for your understanding.

Access Full Project

Publicly Funded

Privately Funded

Bidding Soon

Documents Available

Addenda Available

Post-Bid

Post-Bid

Saving Project...

Full details on over 250,000 Projects including 2000 updated daily available to subscribers

March 27, 2019

April 26, 2019

December 22, 2020

1985 State St

Renovation

No Information to Display

$543,740.00

Public - State/Provincial

img_map_placeholder

1985 State St, Hamden, CT

Subscribe to View Full Documents

Removal of built-up-roofing system to metal deck. Complete roof replacement with fully adhered EPDM roof membrane system, new insulation board, new roof curbs, flashing and fascia edge. Complete removal and replacement of existing roof top HVAC units, related connections and accessories. Selective Demolition; Roof Removal; Metal Decking Repair; Misc. Rough Carpentry; Roofing Insulation; EPDM Roofing; Sheet Metal Flashing & Trim; Roof Accessories; Joint Sealant; Roof Drains; Mechanical Units; Mechanical HVAC support accessories. Contractors Prequalified by DAS for General Building Construction (Group A) At the Pre-Bid Meeting, all prospective bidders shall sign his or her name on the official roster and list the name and address of the company he or she represents. For MANDATORY Pre-Bid Meetings, this shall be done no later than the designated start time of the Pre-Bid Meeting. No attendee will be allowed to register after the advertised start time. Bids submitted by contractors who have not properly registered and attended the MANDATORY Pre-Bid Meeting shall be rejected as non-responsive. See Section 00 25 13 Pre-Bid Meeting Agenda for additional details. Cost Estimate $643,013 - $711,693. Contract Time Allowed: 240 calendar days Prevailing wages are required on this project, in accordance with the schedule provided in the bid documents, pursuant to Connecticut General Statutes (C.G.S.) Section 31-53 (a) through (h), as amended. Each contractor who is awarded a contract on or after October 1, 2002 shall be subject to provisions of C.G.S. 31-55a concerning annual adjustments to prevailing wages. All Project Questions, Bid Questions, and Pre-Bid Equals and Substitution Requests must be submitted fourteen (14) Calendar Days prior to the Bid Due Date. All Project Questions and Pre-Bid Equals and Substitution Requests must be emailed (not phoned) to the Architect/Engineer with a copy to the Construction Administrator and the DAS/CS Project Manager Hoffmann Architects, Inc. at d.costantini@hoffarch.com. or Lisa Humble at Lisa.humble@ct.gov. All Bid Questions must be emailed to the DAS/CS Associate Fiscal Administrative Officer Mellanee Walton Email: Mellanee.Walton@ct.gov. SBE Subcontractors &/or Suppliers: 25%; MBE Subcontractors &/or Suppliers: 6.25%

41 Record(s)

Subscribe to Get All Contact Details

Trades

Division 00 - Lorem Ipsum

Division 00 - Lorem Ipsum

Lorem, Ipsum, Dolor, Sit amet
Subscribe to See All Trade Details

You’ve Reached the Free View Limit

Want to see more project and bidder data in your market? Check out our product options and see what works best for you and your business.

Come back in [[refresh_days]] to get [[project_count]] more free projects.