Access Denied!!!

It appears that you are using a private browser which blocks some scripts necessary for this page to function properly. As a result, you may experience limited functionality or the page may not work at all.

To access this page, please consider using a different browser or switch to the standard version of Firefox.

Thank you for your understanding.

Access Full Project

Publicly Funded

Privately Funded

Bidding Soon

Documents Available

Addenda Available

Post-Bid

Post-Bid

Saving Project...

Full details on over 250,000 Projects including 2000 updated daily available to subscribers

No Information to Display

March 1, 2024

No Information to Display

To Be Determined

Site Work

No Information to Display

$500,000.00

Public - City

img_map_placeholder

To Be Determined, Johnston, IA

Plans and Specifications are not available for this project. If that changes, they will be made available here.

Subscribe to View Full Documents

The existing storm drainage below the Sheldahl pond located near NW 98th Street is a natural channel with undersized culverts. The natural channel and existing drainage structures require resizing. The natural drainage channel flows through back and side yards of lots that have been develop-0d for many years. Linear length of the drainage way from NW 98th Street to northeast corner of the NW 1/4 is 1700 feet. SCHEDULING AND PROJECT STATUS: FY 23-24 Engineering Design FY 24-25 Construction Timing would align with planned sanitary sewer improvements in the same area. RELATIONSHIP TO COMPREHENSIVE PLAN AND OTHER PROJECTS: The Comprehensive Plan does not indicate a change in this established residential area. However, development upstream and the existence of a farm pond could cause impacts on the established area. This project was included as one of the priority projects in the Watershed Assessment and Stormwater Management Plan completed in 2009. The project is included in the city's 2022-2027 capital improvement plan (CIP). As of December 20, 2022, further details regarding design and construction have not been identified. *Project information has been obtained through a public capital improvement plan (CIP). A CIP is a financial schedule for short- and long-range projects which is updated regularly. Information listed in the CIP often evolves based on funding availability and the project details, including timeline and value, are subject to change. The content management team will continue to pursue additional details as they become available. As of August 22, 2023, no new info available

1 Record(s)

Subscribe to Get All Contact Details

Trades

Division 00 - Lorem Ipsum

Division 00 - Lorem Ipsum

Lorem, Ipsum, Dolor, Sit amet
Subscribe to See All Trade Details

You’ve Reached the Free View Limit

Want to see more project and bidder data in your market? Check out our product options and see what works best for you and your business.

Come back in [[refresh_days]] to get [[project_count]] more free projects.