Access Denied!!!

It appears that you are using a private browser which blocks some scripts necessary for this page to function properly. As a result, you may experience limited functionality or the page may not work at all.

To access this page, please consider using a different browser or switch to the standard version of Firefox.

Thank you for your understanding.

Access Full Project

Publicly Funded

Privately Funded

Bidding Soon

Documents Available

Addenda Available

Post-Bid

Post-Bid

Saving Project...

Full details on over 250,000 Projects including 2000 updated daily available to subscribers

February 20, 2019

June 17, 2019

August 14, 2019

Multiple Locations

Renovation

No Information to Display

$475,721.00

Public - City

img_map_placeholder

Multiple Locations, Elk Grove, CA

Subscribe to View Full Documents

Documents to be submitted at the above stated time will be all documents required to be submitted as a part of the bid. The appropriate forms must be submitted by the Contractor at the location stated above, at which time all bidding documents will be opened and publicly read. California Education Code Section 45125.2 requires entities providing construction services to the District to ensure the safety of pupils where employees of the entity or subcontractors will have contact with pupils. Therefore, Contractor shall certify that methods are being undertaken to ensure the pupils safety. Certification must be accomplished by completing the Declaration Regarding Employee Fingerprinting and Criminal Background Check which must be submitted at the time of the bid opening. Certification form is provided in the Bidding Documents This project includes installation of new single-ply roofs @ Anna Kirchgater and Prairie Elementary Schools. This project requires a Class C-39 license. For public works contracts awarded on and after January 1, 2015, those public works projects shall be subject to compliance monitoring and enforcement by the Department of Industrial Relations. As of March 1, 2015, a contractor or subcontractor shall not be qualified to submit a bid or to be listed in a bid proposal subject to the requirements of Public Contract Code section 4104 unless currently registered and qualified under Labor Code section 1725.5 to perform public work as defined by Division 2, Part 7, Chapter 1 (1720 et seq.) of the Labor Code. As of April 1, 2015, a contractor or subcontractor shall not be qualified to enter into, or engage in the performance of, any contract of public work (as defined by Division 2, Part 7, Chapter 1 (1720 et seq.) of the Labor Code) unless currently registered and qualified under Labor Code section 1725.5 to perform public work. In accordance with California Labor Code Section 1773, Elk Grove Unified School District has obtained the general prevailing rate of per diem wages and the general prevailing rate for holiday and overtime work in the locality in which this public work is to be performed for each craft, classification or type of worker needed to execute the contract from the Director of the Department of Industrial Relations. Copies of the prevailing rate of per diem wages are on file and open to public inspection at the office of the District, and reference is made specifically thereto. The Contractor shall cause a copy of the prevailing rate of per diem wages to be posted at the job site. Attention is directed to the provisions of the California Labor Code, Section 1777.5 and 1777.6 concerning employment of apprentices by the Contractor or any subcontractor under him. The prime Contractor is responsible for compliance with the requirements of Section 1777.5 and the prime Contractor and any subcontractor under him shall comply with the requirements of Section 1777.6. This contract includes Sections 1720-1861 of the California Labor Code and Sections 16000-16800 of the California Code of Regulations. The Contractor shall comply with Title 8, Division 1, Chapter 2, Article 1-2 (California Apprenticeship Council). Signature Reprographics maintains the project plan holders list so it is a requirement that prospective bidders purchase their plans from Signature Reprographics to ensure that all potential bidders possess a complete set of documents including any addenda for the project After the scheduled closing time set for receipt of bids, bids may not then be withdrawn for a period of ninety (90) calendar days from and after said closing time, except as otherwise provided for in the California Public Contract Code. Pursuant to California Public Contract Code Section 22300, the contract will contain provision permitting the successful bidder to substitute securities for any moneys withheld by the District as retention. The District reserves the right to reject any or all bids and/or waive any irregularities or informalities in the bidding. By submitting a bid or sub-bid, each bidder and sub-bidder agrees that in the event that it submits any protest to the terms of the Bid Documents or to any subsequent decision by District staff or District's governing board with respect to any bid protest on the project, the District retains the discretion to reject all bids or to make no decision whatsoever. If the District rejects all bids for any reason, fails to make any decision or overrules any protest and awards the contract, the protesting entity waives all claims, rights and causes of action for loss of anticipated profits from the contract or any subcontract, regardless of whether the Districts action is subsequently invalidated by a court of law. The District shall be deemed to have relied to its detriment on such waiver in deciding either to reject all bids or to award the contract. Any attempted reservation of rights waived herein shall be grounds to reject a bid as non-responsive.

12 Record(s)

Subscribe to Get All Contact Details

Trades

Division 00 - Lorem Ipsum

Division 00 - Lorem Ipsum

Lorem, Ipsum, Dolor, Sit amet
Subscribe to See All Trade Details

You’ve Reached the Free View Limit

Want to see more project and bidder data in your market? Check out our product options and see what works best for you and your business.

Come back in [[refresh_days]] to get [[project_count]] more free projects.