Access Denied!!!

It appears that you are using a private browser which blocks some scripts necessary for this page to function properly. As a result, you may experience limited functionality or the page may not work at all.

To access this page, please consider using a different browser or switch to the standard version of Firefox.

Thank you for your understanding.

Access Full Project

Publicly Funded

Privately Funded

Bidding Soon

Documents Available

Addenda Available

Post-Bid

Post-Bid

Saving Project...

Full details on over 250,000 Projects including 2000 updated daily available to subscribers

February 12, 2019

April 30, 2019

February 19, 2020

To Be Determined

Site Work

No Information to Display

$2,053,663.00

Public - City

img_map_placeholder

To Be Determined, Lucas, KS

Subscribe to View Full Documents

The Project consists of constructing system wide rehabilitation of the downtown sanitary sewer system consisting of the following approximate major quantities of work: 1. Isolated Service Tap Repairs (Depth Varies) - 250 EA 2. 8"-15" Diam. Sewer Main CIPP/Fold & Form Liner - 25,345 L.F. 3. 8" Diam. Sewer Main 10' Point Repair (Depth Varies) - 45 EA 4. Manhole Cementitous Lining - 245 VF All persons awarded and/or entering into contracts with the owner shall be subject to and required to comply with the applicable county, state and federal provisions pertaining to non discrimination, labor standards, equal employment opportunity and affirmative action on public contracts, the project is being partially funded by the following, small cities community development block grant program managed by the kansas department of commerce and KDHE-SRF loan. Attention of bidders is particularly called to the requirements as to conditions of employment to be observed and federal prevailing wage rates to be paid under the contract, section 3 of the 1968 housing act, segregated facility, section 109 of the 1984 housing and community development act, the civil rights act of 1964 and executive order 11246. MBE, WBE and DBE are encouraged to submit bids for this work. The owner reserves the right to reject any and all bids and to waive any irregularities therein. Mobilization, traffic control, CCTV inspection of 24,200 LF of existing sewer mains, and inspection of 59 existing manholes. Priority 1 project: rehabilitate apprx 15,700 LF of 10", 12" and 15" sewer main with a CIPP/Fold & Form Liner process, and perform rehabilitation/replacement on identified deficient manholes in the project area.

34 Record(s)

Subscribe to Get All Contact Details

Trades

Division 00 - Lorem Ipsum

Division 00 - Lorem Ipsum

Lorem, Ipsum, Dolor, Sit amet
Subscribe to See All Trade Details

You’ve Reached the Free View Limit

Want to see more project and bidder data in your market? Check out our product options and see what works best for you and your business.

Come back in [[refresh_days]] to get [[project_count]] more free projects.

Related Projects