Access Denied!!!

It appears that you are using a private browser which blocks some scripts necessary for this page to function properly. As a result, you may experience limited functionality or the page may not work at all.

To access this page, please consider using a different browser or switch to the standard version of Firefox.

Thank you for your understanding.

Access Full Project

Publicly Funded

Privately Funded

Bidding Soon

Documents Available

Addenda Available

Post-Bid

Post-Bid

Saving Project...

Full details on over 250,000 Projects including 2000 updated daily available to subscribers

September 29, 2022

December 27, 2022

August 17, 2023

SR 7301

Demolition, New Construction, Paving, Site Work

No Information to Display

$1,151,000.00

Public - State/Provincial

img_map_placeholder

SR 7301, Hollidaysburg, PA

Subscribe to View Full Documents

This project is for the superstructure replacement and substructure rehabilitation of an existing bridge superstructure carrying SR 7301 (5th Avenue) over Mill Run in Blair County. The existing bridge is comprised of single span prestressed concrete adjacent box beams, reinforced concrete slab, and reinforced concrete t-beams on stone masonry substructure units. The existing superstructure will be replaced within the limits of 5th Avenue and extend in the upstream direction to a suitable tie in point to the existing superstructure to remain. Repairs will be performed to the existing substructure. The proposed superstructure is comprised of a single span prestressed concrete spread box beams and a two-span precast concrete slab. The existing two span concrete t-beam section that is being tied into will receive a concrete deck overlay. Minor roadway approach work, drainage, guide rail and other miscellaneous construction is included in this project as indicated on the approved drawings included in the bid package for STATE ROUTE 7301, SECTION MRB, in BLAIR COUNTY, City of Altoona. Project Cost Range: $1,000,000.00 - $2,499,999.99 Federal Project Status: PENNDOT Oversight Non-NHS Structure Work: 53.00% Pre-Bid Meeting: None Wage Rates: Yes Prequalification Requirement: Yes State Type of Work: R&R EXISTING SUPERSTRUCTURE WITH FULL WIDTH CONST Prequalified Subs as Prime: No 408 Version: 2020-4 PennDOT - 5th Ave Mill Run Bridge *The value for this project is based on a financial range. The value is listed as the highest possible cost from the range provided by a stakeholder or official project document. This is an ECMS project. All Addenda will be electronically posted.The location of the public bid opening is the Commonwealth Keystone Building, 7th Floor, Contract Awards Room, 400 North Street, Harrisburg. Allow sufficient time before the bid opening to obtain a visitor pass on the 5th Floor and to be escorted to the 7th Floor Contract Awards Room.

33 Record(s)

Subscribe to Get All Contact Details

Trades

Division 00 - Lorem Ipsum

Division 00 - Lorem Ipsum

Lorem, Ipsum, Dolor, Sit amet
Subscribe to See All Trade Details

You’ve Reached the Free View Limit

Want to see more project and bidder data in your market? Check out our product options and see what works best for you and your business.

Come back in [[refresh_days]] to get [[project_count]] more free projects.

Related Projects