Access Denied!!!

It appears that you are using a private browser which blocks some scripts necessary for this page to function properly. As a result, you may experience limited functionality or the page may not work at all.

To access this page, please consider using a different browser or switch to the standard version of Firefox.

Thank you for your understanding.

Access Full Project

Publicly Funded

Privately Funded

Bidding Soon

Documents Available

Addenda Available

Post-Bid

Post-Bid

Saving Project...

Full details on over 250,000 Projects including 2000 updated daily available to subscribers

November 19, 2018

December 19, 2018

February 17, 2019

To Be Announced

Site Work

No Information to Display

$350,000.00

Public - County

img_map_placeholder

To Be Announced, Stinson Beach, CA

Subscribe to View Full Documents

The Project Work involves the following primary elements: Dry sandblasting and recoating an existing 320,000 gallon welded-steel potable water tank (interior and exterior), minor steel reinforcement and repair work where needed, and the replacement and addition of certain tank accessories. The steel surface preparation shall be SSPC-SP10 (full removal, near-white metal blast cleaning) for the interior and exterior coating systems. The Work also involves repairs to the existing interior and exterior tank ladders, replacing the existing faceplate and float system for the water level indicator, installing a new welded steel cage to the exterior ladder, installing a stainless steel safety climb device for the interior tank ladder, and procuring and installing a new cathodic protection system. Additionally, the Work involves installing a steel plate reinforcement system at the floor-shell plate seam within the interior of the water tank and steel plate patches over corrosion pitting on the tank floor. This project is subject to the requirements of Section 1720 et seq. of the California Labor Code requiring the payment of prevailing wages, the training of apprentices and compliance with other applicable requirements. Contractors and all subcontractors who perform work on the project are required to comply with applicable prevailing wage requirements.

33 Record(s)

Subscribe to Get All Contact Details

Trades

Division 00 - Lorem Ipsum

Division 00 - Lorem Ipsum

Lorem, Ipsum, Dolor, Sit amet
Subscribe to See All Trade Details

You’ve Reached the Free View Limit

Want to see more project and bidder data in your market? Check out our product options and see what works best for you and your business.

Come back in [[refresh_days]] to get [[project_count]] more free projects.

Related Projects