Access Denied!!!

It appears that you are using a private browser which blocks some scripts necessary for this page to function properly. As a result, you may experience limited functionality or the page may not work at all.

To access this page, please consider using a different browser or switch to the standard version of Firefox.

Thank you for your understanding.

Access Full Project

Publicly Funded

Privately Funded

Bidding Soon

Documents Available

Addenda Available

Post-Bid

Post-Bid

Saving Project...

Full details on over 250,000 Projects including 2000 updated daily available to subscribers

October 9, 2023

November 9, 2023

April 1, 2024

311 W Mountain St

Renovation

No Information to Display

$1,575,000.00

Public - City

img_map_placeholder

311 W Mountain St, Pasadena, CA

Subscribe to View Full Documents

As of October 12,2023, this project has not yet been awarded. A timeline for award has not yet been established. The scope of work includes all work described in this spec and also what is shown in the construction documents, but is not limited to the following items: i. EXTERIOR IMPROVEMENTS I. Provide new ADA Parking. II. Scrape for level surface and slurry parking lot and provide new ADA parking stripping for 2 stalls. III. Provide new exterior metal stair case to existing Mezzanine with new metal steel columns, concrete threads, and concrete landing. IV. Provide new concrete pads and new condenser HVAC split units. V. Provide new electrical sub panel. VI. New metal awnings VII. Provide pressure wash and new paint to all exterior of building. ii. INTERIOR IMPROVEMENTS I. Remove and scrape off existing tile flooring at Men's locker room. II. Sawcut and remove concrete slab for new concrete slab and new ceramic tile flooring at Men's & Women's shower and restrooms area. III. Remove and provide new walls and new fur walls at all exterior walls per renovation plan. IV. Renovation of area for Men's and Women's restroom/shower room. Demo and provide new toilet and shower plumbing fixtures, new toilet partitions, toilet accessories, signage, new thresholds, new doors, new glazing at existing windows, tankless water heater, floor drains, shower fixtures, re-piping, and new ceiling framing work. Question Submission Deadline:August 22, 2023, 11:00am

57 Record(s)

Subscribe to Get All Contact Details

Trades

Division 00 - Lorem Ipsum

Division 00 - Lorem Ipsum

Lorem, Ipsum, Dolor, Sit amet
Subscribe to See All Trade Details

You’ve Reached the Free View Limit

Want to see more project and bidder data in your market? Check out our product options and see what works best for you and your business.

Come back in [[refresh_days]] to get [[project_count]] more free projects.