Access Denied!!!

It appears that you are using a private browser which blocks some scripts necessary for this page to function properly. As a result, you may experience limited functionality or the page may not work at all.

To access this page, please consider using a different browser or switch to the standard version of Firefox.

Thank you for your understanding.

Access Full Project

Publicly Funded

Privately Funded

Bidding Soon

Documents Available

Addenda Available

Post-Bid

Post-Bid

Saving Project...

Full details on over 250,000 Projects including 2000 updated daily available to subscribers

October 10, 2018

December 10, 2019

May 31, 2020

188 Richards Ave.

Addition, Demolition, New Construction, Renovation, Site Work

No Information to Display

$21,518,500.00

Public - City

img_map_placeholder

188 Richards Ave., Norwalk, CT

Subscribe to View Full Documents

**As of October 26,2018 project is not yet awarded no timeframe for award. Bidding Limited To: Contractors Prequalified by DAS for General Building Construction (Group C) Threshold Limits: (C.G.S. 29-276b) This Project Does Not exceed Threshold Limits. New construction and renovation of approximately 25,000 gross square feet distributed at two campus buildings. West Campus new construction of a Student Center providing open seating area, food servery with associated food preparation areas and renovations. East Campus Theater new construction expansion and renovations. All project work shall be constructed of new materials. Building's structures are steel with masonry, metal and glass wall systems supported on cast in place concrete foundations enclosed with a membrane insulated roof assembly. Interior finishes include painted gypsum wallboard; floor coverings of tile, rubber, carpet and vinyl; ceilings of gypsum board and acoustical tile. Cost Estimate Range: $18,197,258. To $20,112,752 Guide to the Code of Ethics For Current or Potential State Contractors (for contracts greater than $500,000) Prevailing wages are required on this project, in accordance with the schedule provided in the bid documents, pursuant to Connecticut General Statutes Section 31-53 (a) through (h), as amended. Each contractor who is awarded a contract on or after October 1, 2002 shall be subject to provisions of the Connecticut General Statutes, Section 31-55a concerning annual adjustments to prevailing wages. For all DAS/CS construction projects disturbing one or more total acres of land area on a site regardless of project phasing, the Architect/Engineer shall be responsible for filing a Department of Energy and Environmental Protection (DEEP) General Permit for the Discharge of Stormwater and Dewatering Wastewaters from Construction Activities (DEEP-WPED-GP-015) registration and Stormwater Pollution Control Plan (SPCP) through the online DEEP ezFile Portal prior to bidding. Once the Contractor is under contract with DAS/CS, and prior to the commencement of any construction activities, the Contractor (and all other contractors and subcontractors listed on the SPCP) shall assume responsibility for storm water pollution control and conform to the general permit obligations and requirements by signing the SPCP "Contractor Certification Statement" and License Transfer Form as directed by the Architect/Engineer. At completion of the project, the Contractor shall file a Notice of Termination (DEP-PED-NOT-015) with the DEEP in order to terminate the Construction Stormwater General Permit. A project shall only be considered complete after all post-construction measures are installed, cleaned, and functioning and the site has been stabilized for at least three (3) months following the cessation of construction activities. The Commissioner of the CT Department of Administrative Services reserves the right to do any of the following without liability, including but not limited to: (a) waive technical defects in the bid proposal as he or she deems best for the interest of the State; (b) negotiate with a contractor in accordance with Connecticut General Statutes Section 4b-91;( c) reject any or all bids; (d) cancel the award or execution of any contract prior to the issuance of the "Notice To Proceed;" and, (e) advertise for new bids. All Project Questions and Pre-Bid Equals and Substitution Requests must be emailed (not phoned) to the Architect/Engineer with a copy to the Construction Administrator and the DAS/CS Project Manager Architect/Engineer: Mitchell/Giurgola Architects Email: doherty@mitchellgiurgola.com Construction Administrator: The Whiting Turner Contracting Company Email: chris.haley@whiting-turner.com DAS/CS Project Manager: Lisa Humble Email: lisa.humble@ct.gov All Bid Questions must be emailed to the DAS/CS Associate Fiscal Administrative Officer listed below. DAS/CS Associate Fiscal Administrative Officer: Mellanee Walton Email: mellanee.walton@ct.gov Liquidated Damages: $ 3,394.00 Per Calendar Day Beyond Substantial Completion. $ 3094.00 Per Calendar Day Beyond 90 days After Substantial Completion Within approximately two (2) days after the Bid Opening Date, the Bid Results will be posted on the State Contracting Portal. Contract Time Allowed: Calendar Days: 545

107 Record(s)

Subscribe to Get All Contact Details

Trades

Division 00 - Lorem Ipsum

Division 00 - Lorem Ipsum

Lorem, Ipsum, Dolor, Sit amet
Subscribe to See All Trade Details

You’ve Reached the Free View Limit

Want to see more project and bidder data in your market? Check out our product options and see what works best for you and your business.

Come back in [[refresh_days]] to get [[project_count]] more free projects.