Access Denied!!!

It appears that you are using a private browser which blocks some scripts necessary for this page to function properly. As a result, you may experience limited functionality or the page may not work at all.

To access this page, please consider using a different browser or switch to the standard version of Firefox.

Thank you for your understanding.

Access Full Project

Publicly Funded

Privately Funded

Bidding Soon

Documents Available

Addenda Available

Post-Bid

Post-Bid

Saving Project...

Full details on over 250,000 Projects including 2000 updated daily available to subscribers

August 23, 2018

September 24, 2018

November 19, 2018

Multiple Locations

Renovation

No Information to Display

$203,703.00

Public - City

img_map_placeholder

Multiple Locations, Saginaw, MI

Subscribe to View Full Documents

Site location is on Plans. The contractor shall provide all labor and material for the replacement of boiler equipment at Pinewood Manor and Davenport Manor. All work shall be performed in conformance with current code requirements. The Contractor shall furnish all the labor, material and construction equipment and perform all the work for the Boiler Replacements as shown on the Drawings and described in the specifications prepared by Spicer Group, Inc. Contractor shall be responsible for the entire work until completed and accepted by the Owner.

5 Record(s)

Subscribe to Get All Contact Details

Trades

Division 00 - Lorem Ipsum

Division 00 - Lorem Ipsum

Lorem, Ipsum, Dolor, Sit amet
Subscribe to See All Trade Details

You’ve Reached the Free View Limit

Want to see more project and bidder data in your market? Check out our product options and see what works best for you and your business.

Come back in [[refresh_days]] to get [[project_count]] more free projects.