Access Denied!!!

It appears that you are using a private browser which blocks some scripts necessary for this page to function properly. As a result, you may experience limited functionality or the page may not work at all.

To access this page, please consider using a different browser or switch to the standard version of Firefox.

Thank you for your understanding.

Access Full Project

Publicly Funded

Privately Funded

Bidding Soon

Documents Available

Addenda Available

Post-Bid

Post-Bid

Saving Project...

Full details on over 250,000 Projects including 2000 updated daily available to subscribers

August 9, 2018

September 10, 2018

November 10, 2018

Multiple Locations

Site Work

No Information to Display

No Information to Display

Public - City

img_map_placeholder

Multiple Locations, Highland Park, IL

Subscribe to View Full Documents

**As of January 17,2019 Project was awarded and completed by Copenhaver Construction, Inc. Site : Ravine 3 is located south of Roger Williams Avenue and east of Sheridan Road. St. Johns Avenue is west and south of Ravine 3. The work included in this Contract includes removal of the twelve (12) distressed wooden ditch checks located within the ravine channel along with the demolition of cracked concrete pads and failed gabion mats. There are twelve (12) proposed outfall plunge pools and riffles that will replace the wooded ditch checks. Four (4) stone filled gabion baskets are proposed to address eroded banks along the bends of the ravine toe. The work shall consist of furnishing all the materials, labor, equipment and incidentals required to complete channel excavation as well as cut, fill, and grading required to construct the proposed pools and riffles as detailed in the plans. Ravine site access and soil erosion and sedimentation control shall be in accordance with the permitted construction plans. Site restoration and all other incidental work necessary to complete this improvement shall be executed and maintained until it is approved by the Engineer or his authorized agent. Ravine 3 is located south of Roger Williams Avenue and east of Sheridan Road. St. Johns Avenue is west and south of Ravine 3. The project length measured along the ravine channel is approximately 2,500 feet. The City reserves the right to accept or reject any or all bids. NO paper bids will be accepted. Bid security is required as stated in the "Bid Security"section found on page 2 in the Instructions portion of the Bid Package. Each prospective Bidder shall furnish a copy of a Certificate of Eligibility as issued by the Illinois Department of Transportation. The successful Bidder shall be required to furnish certificates and policies of insurance as required by the Contract. All Contracts for the Construction of Public Works are subject to the Illinois Prevailing Wage Act (820 ILCS 130/1-12). Contractors must provide Certified Monthly Payroll Reports. It is the responsibility of the bidder to inspect the entire bid package and seek clarification of any item which may not be clear to them. For questions, contact Emmanuel Gomez, City Engineer at 847.926.1145 or Danielle Black, Contract Specialist at 847.926.1189.

12 Record(s)

Subscribe to Get All Contact Details

Trades

Division 00 - Lorem Ipsum

Division 00 - Lorem Ipsum

Lorem, Ipsum, Dolor, Sit amet
Subscribe to See All Trade Details

You’ve Reached the Free View Limit

Want to see more project and bidder data in your market? Check out our product options and see what works best for you and your business.

Come back in [[refresh_days]] to get [[project_count]] more free projects.