Access Denied!!!

It appears that you are using a private browser which blocks some scripts necessary for this page to function properly. As a result, you may experience limited functionality or the page may not work at all.

To access this page, please consider using a different browser or switch to the standard version of Firefox.

Thank you for your understanding.

Access Full Project

Publicly Funded

Privately Funded

Bidding Soon

Documents Available

Addenda Available

Post-Bid

Post-Bid

Saving Project...

Full details on over 250,000 Projects including 2000 updated daily available to subscribers

May 5, 2023

July 4, 2023

May 15, 2024

WY-22

Paving, Site Work

No Information to Display

No Information to Display

Public - County

img_map_placeholder

WY-22, Jackson, WY

Subscribe to View Full Documents

ADVERTISEMENT FOR BIDS Teton County, Wyoming Wilson to Stilson Pathway Project Notice is hereby given that Teton County, Wyoming, hereinafter referred to as the "Owner" is accepting Bids for a general contract for the construction of the Wilson to Stilson Pathway Project. Electronic bids for the construction of the Project will be received up to Friday, May 5, 2023 at 2:00 PM Mountain Time. Bids shall be delivered via Public Purchase according to the instructions to bidders. The Project consists of construction of approximately 7,700 linear feet of multi-use pathway, a 200 linear foot single span pedestrian bridge over Fish Creek, signage, striping, grading, and appurtenances. The Project extends primarily along the south side of Highway 22 from the Town of Wilson, under Highway 22 west of the Highway 390 intersection and into the Stilson Transit Center within Teton County, Wyoming. The Issuing Office for the Bidding Documents is: Teton County, Wyoming Complete digital bidding documents for the Wilson to Stilson Pathway Project, Construction #166221 are available beginning April 12, 2023, from Public Purchase at www.publicpurchase.com. Neither Owner nor Engineer will be responsible for full or partial sets of Bidding Documents, including Addenda if any, obtained from sources other than the Issuing Office. Questions regarding the Bidding Documents should be directed to the Pathways Coordinator by phone at 307.732.8573. A mandatory pre-bid conference for the Project will be held on April 26, 2023 at 10:00 AM at the Teton County Public Works Department, located at 320 South King Street, Jackson, Wyoming 83001. The project site may be toured by the contractor at any time and is encouraged. Bids from general contractors not present at the pre-bid conference will not be accepted. Questions may be submitted via Public Purchase up through May 2, 2023. The Project, of which the Work under the Contract Documents is a part, is generally described as follows: Wilson to Stilson Pathway.

19 Record(s)

Subscribe to Get All Contact Details

Trades

Division 00 - Lorem Ipsum

Division 00 - Lorem Ipsum

Lorem, Ipsum, Dolor, Sit amet
Subscribe to See All Trade Details

You’ve Reached the Free View Limit

Want to see more project and bidder data in your market? Check out our product options and see what works best for you and your business.

Come back in [[refresh_days]] to get [[project_count]] more free projects.