Access Denied!!!

It appears that you are using a private browser which blocks some scripts necessary for this page to function properly. As a result, you may experience limited functionality or the page may not work at all.

To access this page, please consider using a different browser or switch to the standard version of Firefox.

Thank you for your understanding.

Access Full Project

Publicly Funded

Privately Funded

Bidding Soon

Documents Available

Addenda Available

Post-Bid

Post-Bid

Saving Project...

Full details on over 250,000 Projects including 2000 updated daily available to subscribers

October 14, 2020

December 14, 2020

January 13, 2022

US-190

Site Work

No Information to Display

$4,201,244.00

Public - City

img_map_placeholder

US-190, Copperas Cove, TX

Subscribe to View Full Documents

Install 16,200 LF of 16" water line along Highway 190 from FM 2657 to Big Divide Road. 12-inch and 16-inch transmission waterline; 0.25 MG prestressed concrete ground storage tank; 0.15 MG composite elevated storage tank; pump station, electrical, and gas chlorination building; horizontal split case pumps; altitude valve assembly; all related yard piping; excavation and backfilling; trench and excavation safety protection; electrical, instrumentation, and controls; concrete access driveways; sidewalks; fencing; civil site improvements; and all appurtenances necessary for completion of the proposed project

80 Record(s)

Subscribe to Get All Contact Details

Trades

Division 00 - Lorem Ipsum

Division 00 - Lorem Ipsum

Lorem, Ipsum, Dolor, Sit amet
Subscribe to See All Trade Details

You’ve Reached the Free View Limit

Want to see more project and bidder data in your market? Check out our product options and see what works best for you and your business.

Come back in [[refresh_days]] to get [[project_count]] more free projects.