Access Denied!!!

It appears that you are using a private browser which blocks some scripts necessary for this page to function properly. As a result, you may experience limited functionality or the page may not work at all.

To access this page, please consider using a different browser or switch to the standard version of Firefox.

Thank you for your understanding.

Access Full Project

Publicly Funded

Privately Funded

Bidding Soon

Documents Available

Addenda Available

Post-Bid

Post-Bid

Saving Project...

Full details on over 250,000 Projects including 2000 updated daily available to subscribers

November 2, 2023

December 4, 2023

February 2, 2029

PA-61

Paving, Site Work

No Information to Display

$125,000,000.00

Public - State/Provincial

img_map_placeholder

PA-61, Cass Township, PA

Subscribe to View Full Documents

This Partial Design/build Project Involves Full Depth Pavement Reconstruction, Safety Improvements Including Realignment of Several Substandard Curves, Installation of a Traffic Signal at Darkwater Road, Wider Shoulders, Reconstruction and/or Rehabilitation of Eight Culverts and Four Retaining Walls, Design/build Bridge, Slope Stabilization, Design/build Temporary Signal, Its Devices, Sign Structure, Design/build Ada Curb Ramps and Miscellaneous Construction as Indicated on the Approved Drawings Included in the Bid Package for State Route 61, Section 14m, in Schuylkill County, Townships of New Castle, Bltyhe, Ryan & West Mahanoy, Boroughs of Saint Clair and Frackville From Segments 0432/0433 Offsets 0342/0342 to Segments 0470/0471 Offsets 0908/0908, From Segment 0470 Offset 0908 to Segment 0490 Offset 0824 and From Segments 0490/0491 Offsets 0824/0827 to Segments 0500/0500 to Offsets 0016/0016. Project Cost Range: $100,000,000.00 - $124,999,999.99 Federal Project Status: Federal Oversight Structure Work: 17.00% Pre-bid Meeting: None Wage Rates: Yes Prequalification Requirement: Yes State Type of Work: Reconstruction Responses to questions on this page are for informational and clarification purposes. Official changes to the proposal will be made via an Addendum. The deadline for submitting questions is 72 hours before the let date and time. For Emergency projects, the deadline is reduced to 19 hours before the let date and time. *The value for this project is based on a financial range. The value is listed as the highest possible cost from the range provided by a stakeholder or official project document. PennDOT - RFP D/B - 61 Reconstruction Saint Clair - Frackville

41 Record(s)

Subscribe to Get All Contact Details

Trades

Division 00 - Lorem Ipsum

Division 00 - Lorem Ipsum

Lorem, Ipsum, Dolor, Sit amet
Subscribe to See All Trade Details

You’ve Reached the Free View Limit

Want to see more project and bidder data in your market? Check out our product options and see what works best for you and your business.

Come back in [[refresh_days]] to get [[project_count]] more free projects.

Related Projects